Question: I have vacation in early June, and in May I slid the vacation 5 days farther into June. Can I slide the vacation footprint again in the June adjustment window, or am I limited to a one time max 5 day slide?
#3
thanks for the quick reply, I was afraid of that....i looked in the contract but didnt see it specifically addressed. do you by chance know a contract reference, just for my education?
#4
Gets Weekends Off
Joined: Nov 2006
Posts: 8,047
Likes: 0
From: 767 FO
Section 7.E.2.a includes this line: A pilot may adjust his vacation period by sliding it up to a maximum of 5 days in either direction.
That seems to cover part of your question. I think the other part is taken care of by the language that says: A pilot may enter a vacation slide submission during the Conflict Input Window immediately before the bid period in which a trip(s) affected by the slide (or the vacation period itself, if no trip is affected)... That "the" apparently means only one slide per vacation since you can only adjust the slide in the bid period prior to when the vacation happens.
That seems to cover part of your question. I think the other part is taken care of by the language that says: A pilot may enter a vacation slide submission during the Conflict Input Window immediately before the bid period in which a trip(s) affected by the slide (or the vacation period itself, if no trip is affected)... That "the" apparently means only one slide per vacation since you can only adjust the slide in the bid period prior to when the vacation happens.
#5
#7
BH -
I went through this with my MAY vacation. I slid both APR and MAY vacations in MAR, then the 'decision maker' changed 'her' mind. So, I attempted a second slide with the MAY vacation in APR. Only allowed one slide.
I contacted the Company and the Union. They're both using a 1999 document, and essentially the excuse of "that's the way it's always been". Doesn't matter whether you're in the CIC window and trying to comply with our current CBA - it's all back to the way it's always been. The question neither could answer was - if it's done in the CIC window, who cares how many times we slide. The VTOs aren't built until after that window closes anyway.
Good luck.
Nakazawa
I went through this with my MAY vacation. I slid both APR and MAY vacations in MAR, then the 'decision maker' changed 'her' mind. So, I attempted a second slide with the MAY vacation in APR. Only allowed one slide.
I contacted the Company and the Union. They're both using a 1999 document, and essentially the excuse of "that's the way it's always been". Doesn't matter whether you're in the CIC window and trying to comply with our current CBA - it's all back to the way it's always been. The question neither could answer was - if it's done in the CIC window, who cares how many times we slide. The VTOs aren't built until after that window closes anyway.
Good luck.
Nakazawa
Thread
Thread Starter
Forum
Replies
Last Post