Operation is running on red line
#471
Gets Weekends Off
Joined: Nov 2011
Posts: 4,556
Likes: 11
#475
This happened a lot in certain categories last year (AtlM88 and Sea330 come to mind). Another one was 3x4 day trips weren't enough but 4x4 day trips was too much. With no other (shorter) trips left, guys could be forced into reserve lines or lines of less than 65 hours, though there are some nuances with how that all plays out. Some people don't mind this, but there should be some contract language to keep this from happening to > X percent of the bid group.
#477
Gets Weekends Off
Joined: Nov 2011
Posts: 4,556
Likes: 11
thats the beauty of this airline, different stuff for different folks. I could be the #1 guy and I'd never bid a hawaii turn, that's way too much time in the cockpit 2 man imho.
#478
Gets Weekends Off
Joined: Jul 2010
Posts: 12,823
Likes: 164
From: window seat
Many are about 26.5 (the min value). Combine that with non commutable (early/late) on both ends and even if you live in base that's one heck of a footprint. You'll always, always, always have to do more than 2, but like someone mentioned, sometimes in some months, 3 is too much. Carry-in/carry-out trips can make line construction even more fun.
#479
Gets Weekends Off
Joined: Feb 2008
Posts: 20,867
Likes: 182
They were 3 man trips but no breaks on the L1011. They would be 3 man trips with a break on the 767.
Thread
Thread Starter
Forum
Replies
Last Post



