Any "Latest & Greatest" about Delta?
Gets Weekends Off
Joined: Feb 2008
Posts: 20,876
Likes: 193
Question..... If you want to use an APD for a trip that covers the Apr/May bid transition when do they run it? I know they start running those for the next month on the 20th like all the rest, but how do they figure the reserve coverage for the days in the following bid (May)? I'm familiar with the 25% rule and I read the contract section about it, but I'm a little confused about how it's worded. It says something about before line bidding for the following month is closed reserve will be "deemed" to have sufficient availability. Does deemed mean assumed?
An APD request will be granted if, at the time of processing, the: number of reserves available in the category is at least 25% of the number of reserves required (as determined by the reserves required formula under Section 23 W., and as shown in DBMS), Note: For purposes of a rotation that is scheduled to begin in one bid period and end in another, prior to the close of line bidding for the second bid period, a day(s) within such second bid period will be deemed to have sufficient reserve availability, provided that such day(s) does not fall within an APD holiday period as described in Section 23 I. 8. a. Exception. Exception: An APD request may be denied regardless of the number of reserves available during the period commencing two days before and ending one day after the following: 1) New Year's Day 2) Super Bowl Sunday 3) Good Friday 4) Easter 5) Memorial Day 6) Independence Day 7) Labor Day 8) Thanksgiving Day 9) Christmas Day
On Reserve
Joined: Feb 2014
Posts: 20
Likes: 0
From: 75/76 capt
Doing Nothing
Joined: Aug 2010
Posts: 1,316
Likes: 0
Line Holder
Joined: Dec 2008
Posts: 93
Likes: 0
From: B717A
Hey guys....what do I need to open the various Training Modules on the Delta web site. I would like to do some home study, but I can't get the Modules open....
Mozilla prompts an "open with" box, but I don't know what I need.
Thanks
Mozilla prompts an "open with" box, but I don't know what I need.
Thanks
If you don't have Office it is available for $9.95 though Delta Perks.
Last edited by Oberon; 03-15-2015 at 10:35 AM. Reason: To point out the deal.
Straight QOL, homie
Joined: Feb 2012
Posts: 4,202
Likes: 1
From: Record-Shattering Profit Facilitator
Apache "Open Office" is free. Has a powerpoint knockoff. Might be worth an shot.
Line Holder
Joined: Apr 2009
Posts: 1,688
Likes: 66
Will PD's for April, first run on the 0700/20Mar run?
I would first put the trip on the swap board as a pu only. You might not have to waste your APD. In the past you had to wait until 20 APR to drop a carry out trip going into May to see the may coverage.That was improved recently. Here is the language.
An APD request will be granted if, at the time of processing, the: number of reserves available in the category is at least 25% of the number of reserves required (as determined by the reserves required formula under Section 23 W., and as shown in DBMS), Note: For purposes of a rotation that is scheduled to begin in one bid period and end in another, prior to the close of line bidding for the second bid period, a day(s) within such second bid period will be deemed to have sufficient reserve availability, provided that such day(s) does not fall within an APD holiday period as described in Section 23 I. 8. a. Exception. Exception: An APD request may be denied regardless of the number of reserves available during the period commencing two days before and ending one day after the following: 1) New Year's Day 2) Super Bowl Sunday 3) Good Friday 4) Easter 5) Memorial Day 6) Independence Day 7) Labor Day 8) Thanksgiving Day 9) Christmas Day
An APD request will be granted if, at the time of processing, the: number of reserves available in the category is at least 25% of the number of reserves required (as determined by the reserves required formula under Section 23 W., and as shown in DBMS), Note: For purposes of a rotation that is scheduled to begin in one bid period and end in another, prior to the close of line bidding for the second bid period, a day(s) within such second bid period will be deemed to have sufficient reserve availability, provided that such day(s) does not fall within an APD holiday period as described in Section 23 I. 8. a. Exception. Exception: An APD request may be denied regardless of the number of reserves available during the period commencing two days before and ending one day after the following: 1) New Year's Day 2) Super Bowl Sunday 3) Good Friday 4) Easter 5) Memorial Day 6) Independence Day 7) Labor Day 8) Thanksgiving Day 9) Christmas Day
Sitting on a 4 hour delay (so far) into JFK - 31R closed for the next 6 weeks - looks like NYC IROPS are going to be the norm until 24 Apr!
Gets Weekends Off
Joined: Sep 2010
Posts: 115
Likes: 0
Thread
Thread Starter
Forum
Replies
Last Post




