![]() |
Originally Posted by Carl Spackler
(Post 870404)
Man is that ever funny! But a slight revision is necessary. You say:
"Some say Ferd’s extraordinary bravado began at birth, where he requested the nurses to breast feed him at the top and bottom of every hour." I hear he still requests that from the flight attendants! Carl Now I know where the storyline from the Buddy Love video came from....Ferd. |
Originally Posted by DAL330drvr
(Post 870764)
I think two weeks should be the norm. What's the rush closing it in one week when they have 210 days to train and convert?
For those that haven't seen the email yet, the extension is due to the fact that crew resources was telling pilots (myself included) that if your freeze expires on Oct. 1, 2010 then they would not be eligible to bid on this AE. Apparently the company and MEC felt this was a serious enough mistake to extend the window for a week. I agree with you, what's anoter week? I'm glad they are watching stuff like this. |
Originally Posted by bigdaddie
(Post 870618)
Do you think if I donate my old 8086 machine then the bids might get done earlier?
For all you young folk (ACL) an 8086 was a computer chip whose first generation was derived to run a drill press. You may know it's younger offspring as the Gazillion Core Intel. I think I could fly the bid request to Japan on a 12 day trip, leave them with an elderly Japanese lady with an abacus, fly back with the results, faster than Delta's super "Tiger Direct" clearance compute used to process these bids. BD But then the union checks them by hand for accuracy, and that takes some time. I dunno if that's true, just what I heard. |
Originally Posted by LeineLodge
(Post 870797)
For those that haven't seen the email yet, the extension is due to the fact that crew resources was telling pilots (myself included) that if your freeze expires on Oct. 1, 2010 then they would not be eligible to bid on this AE. Apparently the company and MEC felt this was a serious enough mistake to extend the window for a week.
I agree with you, what's another week? I'm glad they are watching stuff like this. Does the system lock you out from bidding when you have a freeze, or are you still able to put in AE choices? |
Originally Posted by LeineLodge
(Post 870797)
For those that haven't seen the email yet, the extension is due to the fact that crew resources was telling pilots (myself included) that if your freeze expires on Oct. 1, 2010 then they would not be eligible to bid on this AE. Apparently the company and MEC felt this was a serious enough mistake to extend the window for a week.
I agree with you, what's anoter week? I'm glad they are watching stuff like this. I know there were a lot of guys that regretted bidding a certain piece of equiment, and had October 1st freezes that they were sweating big time, based on the timing of this award. I don't mind the union asking the company to move an award slightly to help guys out, but I don't like it to be marketed as a mistake, if it isn't a mistake. If I'm missing something, let me know. Thanks. |
Unless of course they were telling people they couldn't bid SLC 7ER A or B based on a freeze, in which case there was indeed a mistake.
|
Atlanta hotels
Anybody know of a good hotel in ATL for a commuter type layover. Thinking of deviating at the end of my next rotation, but would need to spend the night in ATL before going home in the morning. Any PM's with info would be much appreciated.
|
Originally Posted by newKnow
(Post 870806)
Lein,
Does the system lock you out from bidding when you have a freeze, or are you still able to put in AE choices? |
Originally Posted by DAL330drvr
(Post 870764)
I think two weeks should be the norm. What's the rush closing it in one week when they have 210 days to train and convert?
|
DeltaNet is back up and some PBS Bids (a few A's) are out.
|
| All times are GMT -8. The time now is 08:11 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands