Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Hiring News (https://www.airlinepilotforums.com/hiring-news/)
-   -   Pinnacle hiring... (https://www.airlinepilotforums.com/hiring-news/52420-pinnacle-hiring.html)

usmc-sgt 06-18-2011 05:58 AM

You get single occupancy

tbjav8r 06-22-2011 08:36 AM

Question: Where does Pinnacle train??

usmc-sgt 06-22-2011 10:20 AM

Ground school is in MEM at the CEC (corporate education center). Not sure where the sims are.

Colgan Pilot 07-04-2011 10:27 AM

I was just wondering if Mesaba / Pinnacle have hired into the Q400 recently?

DL31082 07-10-2011 07:02 AM

Sims are either in flightsafety MEM or flightsafety STL. I don't know if 9E can use XJ 200 sim yet.

Av8tion 07-10-2011 06:09 PM


Originally Posted by Bzwebner (Post 1017768)
I was just wondering if Mesaba / Pinnacle have hired into the Q400 recently?

nope... and they aren't going to... all of Colgan's hiring is into the Saab... and they're insanely understaffed in it...

CTPILOT 07-13-2011 12:58 PM

9E still hiring? Applied little while ago

Kellwolf 07-14-2011 10:36 PM


Originally Posted by CTPILOT (Post 1022057)
9E still hiring? Applied little while ago


Should be. I'm a little out of touch after going to JFK, but looking at the last vacancy, we need FOs in a bad way. Last I heard is they were looking to lower the mins to apply, but the insurance company told 'em "No."

crewdawg 07-23-2011 05:33 PM


Originally Posted by Kellwolf (Post 1022946)
we need FOs in a bad way.

What are the chances of getting DTW out of training?

turbojet28 07-25-2011 07:22 PM

You can hold DTW right out of training. I think there were still like 30 F/O spots unfilled in DTW on the last Pinnacle vacancy if I remember correctly.


All times are GMT -8. The time now is 09:21 AM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands