So much for "industry leading" pairings.
#61
OK. That is a metric $h!t ton of 3-4 day trips. Hope everyone likes being away from home.
Another award winning CBA provision brought to you by B6ALPA.
The fun has just begun. Only 4-8 years until our next contract so get used to it. Good thing y'all we're in such a hurry to vote yes.
Another award winning CBA provision brought to you by B6ALPA.
The fun has just begun. Only 4-8 years until our next contract so get used to it. Good thing y'all we're in such a hurry to vote yes.
Take another look.
#62
On Reserve
Joined: Feb 2013
Posts: 14
Likes: 0
LGB and MCO are the bases that were crushed by this CBA. LGB had an increase of 500% 4 and 5 day pairings with a redeye. They went from 161 one day pairings to 61. They dropped from (158) 2 day pairings to 30 this October. They have 59.9% of their pairings are 4 & 5 days with 95.4% of those having at least one redeye. Any way you slice it, it still stinks.
#63
Gets Weekends Off
Joined: Nov 2005
Posts: 2,714
Likes: 53
LGB and MCO are the bases that were crushed by this CBA. LGB had an increase of 500% 4 and 5 day pairings with a redeye. They went from 161 one day pairings to 61. They dropped from (158) 2 day pairings to 30 this October. They have 59.9% of their pairings are 4 & 5 days with 95.4% of those having at least one redeye. Any way you slice it, it still stinks.
Didnt we also just stopped a ton of intra California and west coast flying. The entire schedule changed out in LGB.
Sent from my iPad using Tapatalk
#64
Line Holder
Joined: Jul 2011
Posts: 1,040
Likes: 0
From: CA
#65
Thread Starter
The REAL Bluedriver
Joined: Sep 2011
Posts: 6,935
Likes: 0
From: Airbus Capt
#66
Banned
Joined: Feb 2009
Posts: 1,445
Likes: 0
#67
Gets Weekends Off
Joined: Jul 2010
Posts: 247
Likes: 0
That email from the Scheduling Committee this morning says it all
"the company built the October pairings with the singular purpose of producing the least expensive pairing set possible"
"(bidding reserve) could be a viable strategy in light of the relative characteristics of the pairings"
They also warned that there may be so many people bidding reserve for October (because of how bad the pairings were) that some folks may not be able to hold reserve.....
"the company built the October pairings with the singular purpose of producing the least expensive pairing set possible"
"(bidding reserve) could be a viable strategy in light of the relative characteristics of the pairings"
They also warned that there may be so many people bidding reserve for October (because of how bad the pairings were) that some folks may not be able to hold reserve.....
#68
Line Holder
Joined: Mar 2012
Posts: 1,173
Likes: 27
Surely that happened, right? Right?
#69
apparently people have not been actually paying attention. the scheduling changes had nothing to do with the contract. the company was taking control of the pairings starting in October 2018 no matter what. the contract had nothing to do with that. others have pointed that out, but no one seems to notice.
we should be very thankful that we have the contract and its extremely strong language regarding pairing construction (it truly is industry leading) or else things would be way, way worse.
ask your friends at united and delta what would happen if the company optimized for lowest cost. would their cba pairing construction rules prevent anything at all? no, they would not.
i know reality doesn't fit the narrative of some of the complainers on here, but there are several of us that still like to point you back toward reality sometimes. I've seen other people do it in this thread, and be ignored, so now it is my turn to do it and be ignored.
we should be very thankful that we have the contract and its extremely strong language regarding pairing construction (it truly is industry leading) or else things would be way, way worse.
ask your friends at united and delta what would happen if the company optimized for lowest cost. would their cba pairing construction rules prevent anything at all? no, they would not.
i know reality doesn't fit the narrative of some of the complainers on here, but there are several of us that still like to point you back toward reality sometimes. I've seen other people do it in this thread, and be ignored, so now it is my turn to do it and be ignored.
#70
Line Holder
Joined: Mar 2012
Posts: 1,173
Likes: 27
apparently people have not been actually paying attention. the scheduling changes had nothing to do with the contract. the company was taking control of the pairings starting in October 2018 no matter what. the contract had nothing to do with that. others have pointed that out, but no one seems to notice.
we should be very thankful that we have the contract and its extremely strong language regarding pairing construction (it truly is industry leading) or else things would be way, way worse.
ask your friends at united and delta what would happen if the company optimized for lowest cost. would their cba pairing construction rules prevent anything at all? no, they would not.
i know reality doesn't fit the narrative of some of the complainers on here, but there are several of us that still like to point you back toward reality sometimes. I've seen other people do it in this thread, and be ignored, so now it is my turn to do it and be ignored.
we should be very thankful that we have the contract and its extremely strong language regarding pairing construction (it truly is industry leading) or else things would be way, way worse.
ask your friends at united and delta what would happen if the company optimized for lowest cost. would their cba pairing construction rules prevent anything at all? no, they would not.
i know reality doesn't fit the narrative of some of the complainers on here, but there are several of us that still like to point you back toward reality sometimes. I've seen other people do it in this thread, and be ignored, so now it is my turn to do it and be ignored.
Know your enemy.
The bottom line is those in position of drafting language should have known what JB would do and build sufficient language into the contract to limit JB's ability to phuck the pilots.
"Industry leading language".
Lol.
Thread
Thread Starter
Forum
Replies
Last Post



