Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Regional (https://www.airlinepilotforums.com/regional/)
-   -   Pinnacle Junior Base (https://www.airlinepilotforums.com/regional/59686-pinnacle-junior-base.html)

jayray2 08-19-2011 08:52 AM


Originally Posted by Diesel450 (Post 1040871)
My understanding the 45 was only for the Pinnacle (jet) side of things, but you are right either way they do not have enough ground instructors...

Why do they need pilots? There are about 40 pilots in MEM on the Saab, 65 in DTW and 75 in MSP. Even after absorbing these 180 pilots they still need more pilots? Does anyone know if they are still interviewing?

IlliniPilot99 08-19-2011 08:56 AM


Originally Posted by jayray2 (Post 1040876)
Why do they need pilots? There are about 40 pilots in MEM on the Saab, 65 in DTW and 75 in MSP. Even after absorbing these 180 pilots they still need more pilots? Does anyone know if they are still interviewing?


not sure about Pinnacle, but Colgan is actively interviewing and the next class is Sept. 12th

Av8tion 08-19-2011 10:41 AM


Originally Posted by Diesel450 (Post 1040871)
My understanding the 45 was only for the Pinnacle (jet) side of things, but you are right either way they do not have enough ground instructors...

No more newhires will be going to the jet... now that we are all one company, there will be a vacancy bid for each newhire class, and there are plenty of saab pilots with standing bids for the jet... so from now on there will no longer be pilots hired directly to the jet... if pinnacle needs more RJ pilots, they will come from XJ saabs or 9L turboprops, and the newhires will fill in the vacuum from over there...

Saabs 08-19-2011 11:26 AM


Originally Posted by Av8tion (Post 1040904)
No more newhires will be going to the jet... now that we are all one company, there will be a vacancy bid for each newhire class, and there are plenty of saab pilots with standing bids for the jet... so from now on there will no longer be pilots hired directly to the jet... if pinnacle needs more RJ pilots, they will come from XJ saabs or 9L turboprops, and the newhires will fill in the vacuum from over there...


All speculation

Al Czervik 08-19-2011 11:51 AM


Originally Posted by Saabs (Post 1040924)
All speculation

Nope. This is the word from corporate.

CoATP 08-19-2011 12:05 PM

At 9E THAT is speculation.

rightside02 08-19-2011 12:19 PM


At 9E THAT is speculation.
I will second the above !!! :). Everything is subject to change over the time it takes to eat lunch at subway next door to the CEC

Saabs 08-19-2011 12:25 PM


Originally Posted by Al Czervik (Post 1040932)
Nope. This is the word from corporate.

Your "corporate" people must have inserted mind probes into all of our saab and q FO's to guess the future then.

If I was a Colgan fo there would be no way in hell i jump to the jet and get seatlocked and miss out on an upgrade.

Saabs 08-19-2011 12:26 PM


Originally Posted by rightside02 (Post 1040944)
I will second the above !!! :). Everything is subject to change over the time it takes to eat lunch at subway next door to the CEC


I hate those Indians and the language barrier they bring to the table. Almost as bad as Air Wisconsin ops!

Av8tion 08-19-2011 12:28 PM


Originally Posted by rightside02 (Post 1040944)
I will second the above !!! :). Everything is subject to change over the time it takes to eat lunch at subway next door to the CEC

not to burst your bubble, but it's never going to change... now that we're all one senority list, those of us who are already here have first dibs on whatever equipment or base there are openings for... the newhires get the rest.. they try to "change" anything and we'll strike...

(disclaimer... I'm not an ALPA nazi by any stretch of the imagination... but if I'm getting stuck with a crappy domicile I'll be damned if I let a newhire take something better than where I'm at...)


All times are GMT -8. The time now is 04:10 AM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands