![]() |
Originally Posted by 757Driver
(Post 1149750)
As will a ton of very senior CAL West Coasters bidding for wide-bodies. Careful what you wish for.
You are one of the who obviously thinks the sun rises and sets with wide body long haul, all nighter legs both ways flying. |
Originally Posted by SKLJ
(Post 1149733)
You do realize they have an AIP for a no flush bid, right?
|
Originally Posted by A320
(Post 1149784)
UAL had 2year 9 mo captains back in 99-2000. Don't worry the music will stop for those types of upgrades especially when SLI is done regardless of how the arbitrators settles it.
|
Hey CAL guys, Didn't a practice bid come and go this last week. Correct me if I'm wrong but could you not tell how many unfilled vacancies(ish) there were? And wouldn't that be the projected furlough/street hiring numbers?
|
Originally Posted by Colonel S
(Post 1149878)
Hey CAL guys, Didn't a practice bid come and go this last week. Correct me if I'm wrong but could you not tell how many unfilled vacancies(ish) there were? And wouldn't that be the projected furlough/street hiring numbers?
|
Originally Posted by Slammer
(Post 1149799)
Ditto at CAL in 2007/2008 with upgrades..
|
Originally Posted by Slammer
(Post 1149888)
243 vancancies, offer to UA furlough then hire off the street, if needed..to fill vacancies. Bid closes 14 Mar
Mystery to me on that calculation...any theories on how Many actual new hires? Either way it's interesting theyve gone darn near all the way through the UAL list to finish the last bid. Interesting times. |
Originally Posted by flybynuts
(Post 1149892)
Yeah but look at when this was...2000. So much has change since then. It's like saying it took 1.5 years to make CA in 1978. Not sure why you even bring this up since it was pre 9/11 and industry deconstruction.
I thought there three year (ish) upgrades at CAL? AND this was after 9-11? Ottopilot wanta chime in? |
Originally Posted by dvhighdrive88
(Post 1149901)
However if you ask some 243 vacancies does not mean 243 new hires. Yet to find anyone who can explain this logic but quite a few saying this bid will result in only 40-100 actual new hires and the rest is just moving people around
Mystery to me on that calculation...any theories on how Many actual new hires? Either way it's interesting theyve gone darn near all the way through the UAL list to finish the last bid. Interesting times. I didn't see any "reductions" of bases in the bid? Anyhow, might see you this Fall (ish). :confused: |
Originally Posted by Short Bus Drive
(Post 1149906)
???
I thought there three year (ish) upgrades at CAL? AND this was after 9-11? Aug 2005 hires were able to hold CA-B737/EWR in 2008. That only lasted till they furloughed the 143. The current snap-shot (1 of 2) has the 8-Ball back to Aug 2005.....This time in GUM. Snap-shot 2 of 2 comes out tomorrow with the final publish on the 15th of this month. Should be interesting. |
| All times are GMT -8. The time now is 04:23 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands