Search
Notices

SLI work begins

Thread Tools
 
Search this Thread
 
Old 12-21-2012, 09:18 PM
  #91  
Line Holder
 
Joined APC: Nov 2011
Position: Unqalified
Posts: 93
Default

Originally Posted by CanoePilot View Post
It would be unfair to place a furlough above an active employee.
Equally unfair would be to place an '07 hire "senior" to a '99 hire.

How about that same '99 hire reverting to 4 years of longevity post TA ratification...What the EF over???

The circular argument that the SLI represents is foolish and unproductive as they get. NO answers will be had on this or any forum...it just doesn't matter...
Horhay is offline  
Old 12-21-2012, 11:31 PM
  #92  
Banned
 
Joined APC: Oct 2010
Position: IAH 737 CA
Posts: 690
Default

Originally Posted by Horhay View Post
Equally unfair would be to place an '07 hire "senior" to a '99 hire.

How about that same '99 hire reverting to 4 years of longevity post TA ratification...What the EF over???

The circular argument that the SLI represents is foolish and unproductive as they get. NO answers will be had on this or any forum...it just doesn't matter...

Your right. We should have figured this out and finalized it with the TPA or with the new contract but both those ships have sailed. Will we learn from the past or make the same mistake the third time, only to regret that one as well?
EWR73FO is offline  
Old 12-22-2012, 04:29 AM
  #93  
Gets Weekends Off
 
cadetdrivr's Avatar
 
Joined APC: Oct 2010
Posts: 2,639
Default

Originally Posted by Mitch Rapp05 View Post
Scope relaxation had nothing to do with the furloughs?
It absolutely did--but probably not in the way that most are thinking.

Notice that UAL did not experience significant 70 seat RJ growth in the months prior to the 737 drawdown nor afterward. UA's desired number of 70 seat RJs were already in place and has been virtually static since. UA's remaining 96 737s in 2008 were not directly replaced by 70 seat RJs although it can be easily argued that 70 seat RJs did replace the 62 737-300/500s that were retired during the BK between 2003-2006.

Rather, the scope hole that permitted the UA 737 reduction was the ability for UAL outsource flying to a codeshare "partner". In this case its partner in the 2008 'virtual merger' (i.e. CAL) where UA placed its code on nearly all CAL flights and UA could more efficiently sell tickets on CAL flights between A and B instead of using UAX. Via the "virtual merger" both UAL and CAL optimized their entire networks (note that CAL also parked aircraft and dropped routes where it competed with UA) and rightsized the fleets and city pairs to eliminate overlap. When the actual merger announcement occurred in 2010 the network heavy lifting was already done and the merger sailed through the DOT/DOJ process with virtually no restrictions other than giving up some token EWR slots.

Last edited by cadetdrivr; 12-22-2012 at 04:49 AM.
cadetdrivr is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
2StgTurbine
Regional
37
12-22-2012 05:42 PM
deltabound
Foreign
18
03-28-2010 02:49 PM
bryced1
Flight Schools and Training
26
10-14-2009 04:14 AM
Busboy
Cargo
110
09-18-2007 05:41 PM
ToiletDuck
Hangar Talk
10
02-27-2007 10:35 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices