Go Back  Airline Pilot Central Forums > Airline Pilot Forums > Major > United
UAL still looking at CS100 & E2 after 700s? >

UAL still looking at CS100 & E2 after 700s?

Search

Notices

UAL still looking at CS100 & E2 after 700s?

Thread Tools
 
Search this Thread
 
Old 01-25-2016 | 03:42 PM
  #1  
Thread Starter
Line Holder
 
Joined: Jun 2015
Posts: 1,864
Likes: 0
From: Left
Default UAL still looking at CS100 & E2 after 700s?

Not sure if this has been discussed. Looks like United is still considering a 100-seater order beyond the 40 737-700s recently ordered... SWISS will operate its first CS100 in the coming months (hopefully providing some good operating data) while the E2 is due out in 2-3 years.

See article below:

https://www.flightglobal.com/news/articles/united-still-considering-a-cseries-or-e2-order-421081/
Reply
Old 01-25-2016 | 04:22 PM
  #2  
Gets Weekends Off
 
Joined: Feb 2015
Posts: 1,875
Likes: 0
From: Downward Dog
Default

Alright man, what's the angle?
Do you work for bombardier?
Reply
Old 01-25-2016 | 04:48 PM
  #3  
Line Holder
20 Years
 
Joined: Mar 2005
Posts: 410
Likes: 3
Default

The company needs to order a SNB in order to gain relief from the "scope choke" in the UPA.

They can order all the 737s they want, but unless they order a new Small Narrow Body (SNB-100 seat-class class airplane), the company is limited on the amount of 76 seat regional aircraft they can have.

Good new is the 737 order was truly for growth! They still need to get a SNB to accomplish what they want.
Reply
Old 01-25-2016 | 06:44 PM
  #4  
Thread Starter
Line Holder
 
Joined: Jun 2015
Posts: 1,864
Likes: 0
From: Left
Default

Originally Posted by WesternSkies
Alright man, what's the angle?
Do you work for bombardier?
I wish! I would make more in sales at Bombardier than I do flying for a living. LOL

No, in reality, I have been a Bombardier operator for many years (both 121 and 135). Yes, Bombardier has not always been a great, consistent manufacturer. However, I have been keenly interested in the C-Series since its inception given its clean sheet design and I have been concerned about the many recent Bombardier missteps and how that would impact a great leap in technology like we are seeing in the C-Series. It is a phenomenal platform (you can fly it efficiently between LAS-LAX or between SBA-HNL or BOS-LCY). The passengers will have fantastic seating, new overhead bins and much better windows for more natural light. Up front, this aircraft was designed by pilots for pilots. The technology employed is as sophisticated or better than what you would see in the 787 - and it will be a comfortable cockpit with sides sticks and huge windows for great visibility. This will be a comfortable cockpit for short, multiple hops or for longer flights (it can fly 3,000 miles). I want to fly it myself! I really think this video does a good job describing the platform and the technological advances:

https://www.youtube.com/watch?v=X9yWF9cCVJY

Overall I am very impressed with the program and I believe it is an apples to oranges comparison when you look at the current Embraer E-Jets. Sure, the E2 version will be better than the existing E190/95, but we have to wait 3 years to see it. The C-Series will be operational in 2-3 months at SWISS and we will get to see how it operates on the line. Let's hope for a smooth entry-into-service. Again, both Delta and United are apparently considering the C-Series versions (CS100 or CS300) - with Bombardier's need for a big deal, now is the time to negotiate and get favorable pricing!
Reply
Old 01-25-2016 | 07:12 PM
  #5  
APC225's Avatar
Gets Weekends Off
 
Joined: Feb 2011
Posts: 3,866
Likes: 0
Default

Originally Posted by WesternSkies
Alright man, what's the angle?
Do you work for bombardier?
The engineer behind the Skreemr jet has unveiled another radical, much faster design for future air travel.

Charles Bombadier latest concept jet is capable of reaching Mach 24 - more than twice the speed of the Skreemr and 12 times faster than Concorde.

Dubbed the 'Antipode', it can carry 10 people up to 12,430 miles (20,000km) in under an hour, allowing it to travel from London to New York in just 11 minutes.

Fly from New York to London in 11 MINUTES: Radical ?Antipode? concept plane that uses rocket boosters revealed* - Detroit Newstime
Reply
Old 01-25-2016 | 08:59 PM
  #6  
Firsttimeflyer's Avatar
Stuck Mic
 
Joined: Dec 2013
Posts: 1,059
Likes: 0
Default

How about the fact that more jets at mainline is a plus for everyone no matter if you are a new hire as an FO overall making more than you would as a RJ captain or if you were a junior cS100 captain making more than you would as a mainline FO

Or should we hold out for a 3% Pay raise and keep the RJ BS alive so thousands of pilots can live on substandard wages as ALPA professional pilots
Reply
Old 01-26-2016 | 01:20 AM
  #7  
Gets Weekends Off
 
Joined: Aug 2008
Posts: 1,512
Likes: 0
From: 787 Captain
Default

Originally Posted by jumppilot
The company needs to order a SNB in order to gain relief from the "scope choke" in the UPA.

They can order all the 737s they want, but unless they order a new Small Narrow Body (SNB-100 seat-class class airplane), the company is limited on the amount of 76 seat regional aircraft they can have.

Good new is the 737 order was truly for growth! They still need to get a SNB to accomplish what they want.

I know it's just semantics, but I wanted to highlight that need NSNB on the property to get the additional 76 seaters. Orders aren't enough.
Reply
Old 01-26-2016 | 04:52 AM
  #8  
Line Holder
 
Joined: Apr 2013
Posts: 740
Likes: 38
Default

Originally Posted by David Puddy
Not sure if this has been discussed. Looks like United is still considering a 100-seater order beyond the 40 737-700s recently ordered... SWISS will operate its first CS100 in the coming months (hopefully providing some good operating data) while the E2 is due out in 2-3 years.


See article below:

https://www.flightglobal.com/news/articles/united-still-considering-a-cseries-or-e2-order-421081/
CS isn't happening , get over it. It would take 2 years to get the CS program up and running if they were going to do it, which they aren't.
Reply
Old 01-26-2016 | 06:44 AM
  #9  
Thread Starter
Line Holder
 
Joined: Jun 2015
Posts: 1,864
Likes: 0
From: Left
Default

Originally Posted by GPullR
CS isn't happening , get over it. It would take 2 years to get the CS program up and running if they were going to do it, which they aren't.

Thank you Mr. Embraer. Clearly you know everything. How long have you been negotiating a potential order?

2 years to get the CS program up and running? Really? Bombardier would likely move heaven and earth if UAL made an order. There are leasing companies with early CS100 slots that could accommodate UAL should they need aircraft ASAP. SWISS will start to use the CS100 in the next two months and SWISS pilots are already being trained.... When is the first E2 expected? 2-3 years? Gee, I don't know how I will get over it if you guys fly a revamped E190 in 3+ years... I'll be devastated!

Last edited by David Puddy; 01-26-2016 at 07:22 AM.
Reply
Old 01-26-2016 | 09:16 AM
  #10  
Gets Weekends Off
 
Joined: Jan 2008
Posts: 229
Likes: 0
From: CRJ, CR7, A320, B737
Default

Originally Posted by David Puddy
Thank you Mr. Embraer. Clearly you know everything. How long have you been negotiating a potential order?

2 years to get the CS program up and running? Really? Bombardier would likely move heaven and earth if UAL made an order. There are leasing companies with early CS100 slots that could accommodate UAL should they need aircraft ASAP. SWISS will start to use the CS100 in the next two months and SWISS pilots are already being trained.... When is the first E2 expected? 2-3 years? Gee, I don't know how I will get over it if you guys fly a revamped E190 in 3+ years... I'll be devastated!
I think the point he's trying to make is that it takes quite a bit of time to get a new aircraft type program up and running at a major airline. You need a fleet manager. You need to train the instructors and LCAs. You need to train the initial line pilots. You need to train mechanics all over the system to work and maintain them. You need to build up a spare parts supply. Manuals and procedures need to be written and vetted. And, the FAA needs to sign off on the whole package. I'm sure that would take well over a year to get in place. Look how long APU On_Demand is taking to get going on the Guppy.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
ReserveDog
United
46
05-23-2014 07:23 AM
Airhoss
United
210
09-04-2012 06:48 AM
TruthHurts
United
49
04-04-2012 09:07 AM
Low & Slow
Major
37
08-23-2007 05:07 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices