![]() |
Originally Posted by chuck416
(Post 890038)
Hi FTB,
Was this in MEM? Maybe holding short of 36L? Chuck
Originally Posted by reddog25
(Post 890053)
And it's still a DC-9!!!!!!
|
Originally Posted by Gunfighter
(Post 889807)
Gate 69
Delaid flight The grass strip |
Originally Posted by forgot to bid
(Post 889416)
Also, if your flight is to leave at 9:52am, then D0 should be 5 minutes later, not 9:52. We should be taking care of our passengers right up to 9:52am not right up to 9:42am. This is a real problem. Gate agent are now to have the numbers in the computer at D-7... So they get a delay if this is not done. I asked several ACS in ATL about this and they said yep they cannot reopen a flight after D-7 w/o getting a delay. So if they said they will not add people after have closed the flight. Even with 6mins left. Seems counterintuitive to me. So what's the point of being able to block out 5mins early with people still at the gate? This last trip I got most of WDRs 5-6min b4 sched dept. Who knows how many tight conx ( that could have used 5mins more) we left behind. |
Attn New York based pilots... Council 66 elections are now open. You can vote for your reps online, it's easy and takes less than 3 minutes... just log into the alpa website (www.alpa.org) and click on the big vote button in the upper right hand side of the page. Election runs until 10am on Nov. 10
|
Originally Posted by Carl Spackler
(Post 889370)
I can't find it in writing that you cannot do the performance check while at the get if AWABS comes early. In fact, I thought the training video showed that as an option.
Just because some LCA says something, doesn't make it policy. They have to be able to back that up in writing. Does anyone know where it might be stated in writing? Carl I don't have the bulliiten with me. Maybe someone does.... |
Originally Posted by BigGuns
(Post 890121)
Carl, I don't know about other fleets, but the WDR Bulliten for the 88 does say that the performance checklist can not be completed till after the completion of the afterstart checklist.
I don't have the bulliiten with me. Maybe someone does.... |
Originally Posted by BigGuns
(Post 890121)
Carl, I don't know about other fleets, but the WDR Bulliten for the 88 does say that the performance checklist can not be completed till after the completion of the afterstart checklist.
I don't have the bulliiten with me. Maybe someone does.... Wasn't this because of final flap check? |
Sig, thanks for the heads up.
Do not forget to vote guys. This you can do from you home! Lets get a record turnout. Beat C44 level of 34% last year. Go for 95%. |
Originally Posted by FlyingViking
(Post 890138)
Wasn't this because of final flap check?
|
Originally Posted by DAL 88 Driver
(Post 890135)
From the DC-9 FCB 10-03, page 6: "Performance data loading may be accomplished at the gate, if the WDR is available; however, the Performance Checklist may not be completed until after the PUSHBACK/START and AFTER START checklists are complete. At no time should performance data loading conflict with other critical duties such as pushback (two pilot crew) or taxi."
|
| All times are GMT -8. The time now is 11:57 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands