![]() |
Originally Posted by FlybyMI
(Post 2982014)
N186GJ exited conformity yesterday and is now in service.
https://flightaware.com/live/flight/...210Z/KSLN/KATL |
Originally Posted by Meow1215
(Post 2982029)
I wonder for how long...
|
Originally Posted by Jk3728
(Post 2982243)
looks like first flight on the line for it cancelled.
|
Originally Posted by JulesWinfield
(Post 2982264)
haha. One of them needed a new engine shortly have coming online.
|
Originally Posted by Jk3728
(Post 2982289)
gojets maintenance then a heavy check still won’t fix it.... our guys have a long summer ahead. at least won’t have to NonRev cringing seeing it’s a flight operated by gojets with a 50% delay rate.....
|
Originally Posted by JulesWinfield
(Post 2982331)
Interesting that our MEL assumes 2 FMS are installed in the 900. I don't think we can operate these single FMS 900 configurations, as is.
Sent from my SM-G965U using Tapatalk |
Originally Posted by Casualinterest
(Post 2982334)
I mean I'm sure it wouldn't be impossible to delineate by serial different procedures. They just need to update the MEL. We already have different procedures for different equipped aircraft. IRS vs AHRS etc
Sent from my SM-G965U using Tapatalk |
Originally Posted by KelvinHelmholtz
(Post 2982335)
shouldn’t they have updated the MEL before trying to put the planes in service?
Sent from my SM-G965U using Tapatalk |
It gets complicated with one FMS now, you need FMS failure procedures if the missed approach is RNAV required and a non-RNAV alternate approach if your planning a RNAV approach at your destination.
|
Our MELs are 700/900, and all of the 700s only have one FMS...
|
| All times are GMT -8. The time now is 10:58 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands