Start class on the 24th. Looks like DFW is not going to be an option at indoc. I do plan on bidding the 145 to keep DFW an option. Any idea how long it's taking to get back into DFW? I live here and the fact that I could be based at home was the #1 reason I took the job. I just cashed out on a severance package from NetJets that will supplement the weaker pay at Envoy for a few years and am in the pool at VX, but am not looking forward to the commute that will entail. Thanks guys! Looking forward to getting back to 121.
|
Originally Posted by slavetotheman
(Post 2226582)
Any idea how long it's taking to get back into DFW? I live here and the fact that I could be based at home was the #1 reason I took the job.
|
Originally Posted by Meatball
(Post 2226759)
Not until there is a vacancy and nobody knows when that all happen. If you are the CRJ in ORD, you will most likely never get to DFW so take the EMJ!
|
I wonder if the 175 will be available in January?
|
Originally Posted by slavetotheman
(Post 2226582)
Start class on the 24th. Looks like DFW is not going to be an option at indoc. I do plan on bidding the 145 to keep DFW an option. Any idea how long it's taking to get back into DFW? I live here and the fact that I could be based at home was the #1 reason I took the job. I just cashed out on a severance package from NetJets that will supplement the weaker pay at Envoy for a few years and am in the pool at VX, but am not looking forward to the commute that will entail. Thanks guys! Looking forward to getting back to 121.
Since NY is opening up that created a 35-40 pilot spots that will be filled by new hires. If you get hired before they start hiring into NY then it might take a month or two longer. Right now it's a lot of speculation but wait a few days for a flow plan (A flow plan is the companies semireliable plan on when a pilots upgrade training, base transfer, or equipment transfer will take place.) to come out from the last bid. This will tell us how fast they are going to open up NY and what date they are going to start. |
Originally Posted by Pedro4President
(Post 2226848)
You should get it very quick out of training. What took so long the past couple years was the stagnation. With classes filling up for the foreseeable future, this will cause lots of movement. Guys are currently getting DFW out of training. Guys hired last winter/spring were awarded the transfer from ORD to DFW on the EMB 145. About 45 got awarded the transfer and about 25 came straight away and about 10 have still yet to transfer (scheduled on DEC 1).
Since NY is opening up that created a 35-40 pilot spots that will be filled by new hires. If you get hired before they start hiring into NY then it might take a month or two longer. Right now it's a lot of speculation but wait a few days for a flow plan (A flow plan is the companies semireliable plan on when a pilots upgrade training, base transfer, or equipment transfer will take place.) to come out from the last bid. This will tell us how fast they are going to open up NY and what date they are going to start. Lga is Jan 1st it's in the 3*, with the second half being Jan 31st. |
Originally Posted by lakehouse
(Post 2226879)
Lga is Jan 1st it's in the 3*, with the second half being Jan 31st.
|
Originally Posted by Pedro4President
(Post 2226892)
You think they will have to end up using TDY to cover February?
|
High number of reserve
Originally Posted by Machwon
(Post 2226538)
56crj out of 156 and 50emb out of 203.
|
Because most of the lines are worth less than 75 hours...... wait.. that can't be it
|
All times are GMT -8. The time now is 10:02 PM. |
User Alert System provided by
Advanced User Tagging v3.3.0 (Lite) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
Website Copyright ©2000 - 2017 MH Sub I, LLC dba Internet Brands