Kalitta Air (K4) Information
#2493
Most likely none. The bid should have accounted for this. By the time the last awarded pilot trains the 270 days will be up and they will have the number of captains needed. Remember that we only need 1 captain for every 2-3 FO's so the 60 FO's awarded equals the 20 captains. Factoring in the captains already on the aircraft I wouldn't hold your breath for a bid soon.
#2494
Line Holder
Joined APC: Feb 2014
Posts: 40
Most likely none. The bid should have accounted for this. By the time the last awarded pilot trains the 270 days will be up and they will have the number of captains needed. Remember that we only need 1 captain for every 2-3 FO's so the 60 FO's awarded equals the 20 captains. Factoring in the captains already on the aircraft I wouldn't hold your breath for a bid soon.
#2495
Of the most recent bid? Zero. Of the original bid? 4 with a few check airman also. IMO there will not be a significant bid allowing for upgrades, with the possible exception of the 767, in the near term. But I can certainly be wrong.
#2496
Line Holder
Joined APC: Feb 2014
Posts: 40
Never know what may be required
#2497
Gets Weekends Off
Joined APC: Apr 2010
Posts: 291
#2498
Thread
Thread Starter
Forum
Replies
Last Post