![]() |
Anyways....
Back on topic. 2500 WARN notices for pilots. |
What date I’d hire does that go back to?
|
Originally Posted by FettyWap
(Post 3092513)
What date I’d hire does that go back to?
|
Originally Posted by rcflying53
(Post 3092501)
Back on topic. 2500 WARN notices for pilots.
|
Originally Posted by biigD
(Post 3092531)
Sorry, I'm slow. Where is this posted? I saw the 25,000 company wide from the e-mail...
Let's all remember that WARN notices are not furlough notices. Even if they end up furloughing, IF, it won't be 2500 just because 2500 got the WARN letter. That's even touched on down in the Q & A section at the bottom of the announcement. |
Originally Posted by biigD
(Post 3092531)
Sorry, I'm slow. Where is this posted? I saw the 25,000 company wide from the e-mail...
|
Thanks guys. I'm so used to not looking at Jetnet for anything actually pilot related, I didn't think to look there!
|
Originally Posted by Al Czervik
(Post 3092516)
4/17 Hire Date.... if that’s what you were asking.
This whole thing blows |
Good luck everyone. Hopefully we don’t use all of them.
|
Originally Posted by FettyWap
(Post 3092542)
Yes. Have a friend there that’s a 2018 hire. Was at SWA 18 months before that. Although a 2017 hire at SWA might not be in a great position either.
This whole thing blows |
| All times are GMT -8. The time now is 09:00 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands