Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Delta (https://www.airlinepilotforums.com/delta/)
-   -   Any "Latest & Greatest" about Delta? (https://www.airlinepilotforums.com/delta/36912-any-latest-greatest-about-delta.html)

iaflyer 01-18-2013 08:34 AM


Originally Posted by buzzpat (Post 1333487)
I need some bidding help. I bid reserve for Feb to take a break. I haven't done it in so long that I can't remember some of the basics. I'm trying to move a couple of x days but can't get it to accept. Keep getting a message that says its an invalid date but both days are in Feb and I'm trying to figure out why it won't go through. Any of you reserve superstars help a brother out? Thanks!

Make sure you selected the correct bid period in the drop box box, PCS defaults to the current bid period. I make that mistake all the time.

jabwmu 01-18-2013 08:40 AM


Originally Posted by jabwmu (Post 1333493)
Anyone know where the contract language is for short call buckets? I know it was in a Letter of Agreement but can't find it on Alpa's website.

Thanks.

I think I found it. It's located under "Negotiators Notepad 10-03 - LOA #22." However when I try to open it a message comes up saying "The resource you are looking for has been removed, had its name changed, or is temporarily unavailable."

Anyone know where this info is now located?

Bucking Bar 01-18-2013 08:43 AM


Originally Posted by buzzpat (Post 1333487)
Hey guys,

I need some bidding help. I bid reserve for Feb to take a break. I haven't done it in so long that I can't remember some of the basics. I'm trying to move a couple of x days but can't get it to accept. Keep getting a message that says its an invalid date but both days are in Feb and I'm trying to figure out why it won't go through. Any of you reserve superstars help a brother out? Thanks!

Buzz

Buzz,

You have to also consider reserve day grouping requirements. I don't know what equipment you are on, or what you are trying to move. Generally, it will not let you put individual off days outside of a group and not let you stack everything together.

You also need to ensure the reserves required number is less than those available.

... and don't forget you have a PD if you really need to use it.

TeddyKGB 01-18-2013 08:53 AM


Originally Posted by Bucking Bar (Post 1333507)
Buzz,

You have to also consider reserve day grouping requirements. I don't know what equipment you are on, or what you are trying to move. Generally, it will not let you put individual off days outside of a group and not let you stack everything together.

You also need to ensure the reserves required number is less than those available.

... and don't forget you have a PD if you really need to use it.

reserve day grouping violations will not generate an "invalid date" message. Make sure you select the 31Jan bid period when you go to move reserve days around because the default will be for the current 01Jan bid period.

buzzpat 01-18-2013 09:35 AM


Originally Posted by Delta1067 (Post 1333514)
reserve day grouping violations will not generate an "invalid date" message. Make sure you select the 31Jan bid period when you go to move reserve days around because the default will be for the current 01Jan bid period.

Yeah, I'm in the 31Jan bid period. Just trying to move 2. It might be a group violation. I'll pull out the PD if I have to. Reserve coverage is great.

johnso29 01-18-2013 09:42 AM


Originally Posted by buzzpat (Post 1333487)
Hey guys,

I need some bidding help. I bid reserve for Feb to take a break. I haven't done it in so long that I can't remember some of the basics. I'm trying to move a couple of x days but can't get it to accept. Keep getting a message that says its an invalid date but both days are in Feb and I'm trying to figure out why it won't go through. Any of you reserve superstars help a brother out? Thanks!

Buzz

Since its set up to move blocks of days and you're only moving a single X day, make sure you enter that single day twice. For example. If you want to move the 8th to the 16th make sure you enter 08-08 16-16. And make sure you're moving the actual day off to a work day, and not the reverse. :D

FlyingDutchman 01-18-2013 10:10 AM


Originally Posted by buzzpat (Post 1333487)
Hey guys,

I need some bidding help. I bid reserve for Feb to take a break. I haven't done it in so long that I can't remember some of the basics. I'm trying to move a couple of x days but can't get it to accept. Keep getting a message that says its an invalid date but both days are in Feb and I'm trying to figure out why it won't go through. Any of you reserve superstars help a brother out? Thanks!

Buzz

Hey Buzz, I think we have to wait till Jan 20th to make changes to the Feb. schedule.

buzzpat 01-18-2013 10:10 AM


Originally Posted by johnso29 (Post 1333534)
Since its set up to move blocks of days and you're only moving a single X day, make sure you enter that single day twice. For example. If you want to move the 8th to the 16th make sure you enter 08-08 16-16. And make sure you're moving the actual day off to a work day, and not the reverse. :D

I'm moving 2 and I am moving off days to work days. Baffled. I'll keep trying. Thanks guys!

johnso29 01-18-2013 10:19 AM


Originally Posted by buzzpat (Post 1333555)
I'm moving 2 and I am moving off days to work days. Baffled. I'll keep trying. Thanks guys!

Buzz,

Try doing single day transactions, as opposed to a group of days. See if that works.

johnso29 01-18-2013 10:20 AM


Originally Posted by FlyingDutchman (Post 1333553)
Hey Buzz, I think we have to wait till Jan 20th to make changes to the Feb. schedule.

The transaction won't be processed until 0700 on 1/20, but you can get it set up.


All times are GMT -8. The time now is 08:44 PM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands