Any "Latest & Greatest" about Delta?
When they get done with their debate, all, none or some of these posts will be removed. (Mine included) Have to admit that I was just trying to make a point prior to my morning coffee. Scheduling called and I had not gone back to sleep.
As it is Johnso's call he can do what he just did.
Moderator
Joined: Dec 2007
Posts: 7,263
Likes: 105
From: DAL 330
Here's another failure of outsourcing.
A vendor has a plane that's going to fly a leg for Mainline Airways, get to the outstation, and then fly a few legs as Vendor Independent Airlines.
The first leg gets not only fuel to get to the destination, but 45 minutes worth of taxi fuel when it's known to be a 10 minute taxi at the moment, plus fuel for an alternate when it's not needed, plus 30 minutes of holding fuel, plus 20 minutes of contingency fuel.
It lands as Mainline Express at the outstation with a few thousand pounds above what it needs. Now it's that much closer to being at release fuel for its flight as Vendor Independent Airlines, where it's competing with the parent company that just bought half of the fuel that's in the tank.
A vendor has a plane that's going to fly a leg for Mainline Airways, get to the outstation, and then fly a few legs as Vendor Independent Airlines.
The first leg gets not only fuel to get to the destination, but 45 minutes worth of taxi fuel when it's known to be a 10 minute taxi at the moment, plus fuel for an alternate when it's not needed, plus 30 minutes of holding fuel, plus 20 minutes of contingency fuel.
It lands as Mainline Express at the outstation with a few thousand pounds above what it needs. Now it's that much closer to being at release fuel for its flight as Vendor Independent Airlines, where it's competing with the parent company that just bought half of the fuel that's in the tank.
I hate outsourcing as much as the next guy (and twice as much as the guy next to him) but wouldn't the aircraft also have the FAR fuel minimums in it when it shows up as a DAL connection flight? Theoretically. unless it was operated under other than part 121, you would think it would all average out in the long run - of course I could be missing something here - only halfway through my first cup of coffee.
I guess if they were stingy on contingency fuel there might be a difference over the long run.Scoop
Contrails,
I hate outsourcing as much as the next guy (and twice as much as the guy next to him) but wouldn't the aircraft also have the FAR fuel minimums in it when it shows up as a DAL connection flight? Theoretically. unless it was operated under other than part 121, you would think it would all average out in the long run - of course I could be missing something here - only halfway through my first cup of coffee.
I guess if they were stingy on contingency fuel there might be a difference over the long run.
Scoop
I hate outsourcing as much as the next guy (and twice as much as the guy next to him) but wouldn't the aircraft also have the FAR fuel minimums in it when it shows up as a DAL connection flight? Theoretically. unless it was operated under other than part 121, you would think it would all average out in the long run - of course I could be missing something here - only halfway through my first cup of coffee.
I guess if they were stingy on contingency fuel there might be a difference over the long run.Scoop
Think about the discretion involved though, as to how much fuel is going to be loaded at departure considering the destination and overall situation.
You could have a day that's 30SM and CLR but a vendor is adding an alternate, holding fuel, lots of taxi fuel, and contingency fuel only to take all of that gas which it knew wouldn't be needed, and burn it on their own flight the next leg.
This is one of those very convoluted situations. Basically, if they put you on "rest" and don't assign anything in advance of starting "rest", they can't assign you anything that begins before the end of "rest" plus 5 hours. They can give you a trip or assign SC before "rest" starts and have the report immediately after the "rest". If they wait to give you an assignment within 9 hours of the end of "rest", then the report/start must be 12 hrs from the time of the assignment.
Several different contract sections control this and the schedulers don't do a very good job of abiding by it because it is confusing. If you are on "rest" and they call you with any assignment, best to wait until near the end of "rest" or after to call and ask what they are doing. Think of "rest" as your last X day and adjust the times according to when your rest ends. If they start talking about "add-on rest", call the ALPA office and ask for someone in scheduling.
This is my understanding of this issue and I am not a contract guru.
Several different contract sections control this and the schedulers don't do a very good job of abiding by it because it is confusing. If you are on "rest" and they call you with any assignment, best to wait until near the end of "rest" or after to call and ask what they are doing. Think of "rest" as your last X day and adjust the times according to when your rest ends. If they start talking about "add-on rest", call the ALPA office and ask for someone in scheduling.
This is my understanding of this issue and I am not a contract guru.

Gets Weekends Off
Joined: Aug 2010
Posts: 2,530
Likes: 0
And in fairness to a unbiased opinion, I have requested that all of the mods, admins and owners chime in on the subject. I do know of one mod that removes all political posts, but that is one of 12.
When they get done with their debate, all, none or some of these posts will be removed. (Mine included) Have to admit that I was just trying to make a point prior to my morning coffee. Scheduling called and I had not gone back to sleep.
When they get done with their debate, all, none or some of these posts will be removed. (Mine included) Have to admit that I was just trying to make a point prior to my morning coffee. Scheduling called and I had not gone back to sleep.

Gets Weekends Off
Joined: Jul 2010
Posts: 12,831
Likes: 172
From: window seat
Contrails,
I hate outsourcing as much as the next guy (and twice as much as the guy next to him) but wouldn't the aircraft also have the FAR fuel minimums in it when it shows up as a DAL connection flight? Theoretically. unless it was operated under other than part 121, you would think it would all average out in the long run - of course I could be missing something here - only halfway through my first cup of coffee.
I guess if they were stingy on contingency fuel there might be a difference over the long run.
Scoop
I hate outsourcing as much as the next guy (and twice as much as the guy next to him) but wouldn't the aircraft also have the FAR fuel minimums in it when it shows up as a DAL connection flight? Theoretically. unless it was operated under other than part 121, you would think it would all average out in the long run - of course I could be missing something here - only halfway through my first cup of coffee.
I guess if they were stingy on contingency fuel there might be a difference over the long run.Scoop
Gets Weekends Off
Joined: Jun 2009
Posts: 5,113
Likes: 0
I don't know that I want to raisemy blood pressure over this, but I would agree that there are plenty of other venues to engage in political talk. The best way is for the mods to do their job and remove the posts, ever so simply and correctly. They don't seem to have a problem enforcing the other aspects of the TOS, no matter how assinine.
Did I just say"ass" in nine?
Did I just say"ass" in nine?
Gets Weekends Off
Joined: Jul 2006
Posts: 1,724
Likes: 0
From: Boeing Hearing and Ergonomics Lab Rat, Night Shift
He actually brings up a good point. Of course it would arrive with legal fuel. He is saying the outbound leg on behalf of a mainline will be "fat fueled" so that it lands at its next destination with more than legal fuel which was paid for by the mainline but will be burned doing someone else's flying. There is already some sneaky DH-ing going on by "air group" portfolios who fly for everyone. Stealing a few hundred pounds here or a thousand pounds there is a very real possibility. The shell game of multi airline outsourcing ACMI is not only bad for pilots at every level its one of the most poorly thought out MBA classroom brainchildren in the industry.
Thread
Thread Starter
Forum
Replies
Last Post





