Quote:
Technically true that it doesn’t make the SIC ‘required’, the time is loggable on 91 Repo legs. See section 9 of the AC and the NPRM that came out last summer.Originally Posted by Docflyer
Here is the Advisory Circular. Basically it allows a 135 air carrier with the proper Opspec (A062) to allow SICs, to log SIC time on 91 legs. They call it the "Second in Command Professional Development Program", or SIC PDP. It does not require an SIC for 91 legs. Planesense does not currently have this Opspec.