Notices
Major Legacy, National, and LCC

Here it comes

Old 06-12-2009 | 03:57 AM
  #61  
buzzpat's Avatar
Gets Weekends Off
 
Joined: Feb 2008
Posts: 6,070
Likes: 1
From: Urban chicken rancher.
Default

Guys,

I was furloughed in 01....just came back a year ago after deferring for a year. This is sounding (sadly) eerily familiar. This sucks.
Reply
Old 06-12-2009 | 04:13 AM
  #62  
acl65pilot's Avatar
Happy to be here
 
Joined: Jun 2006
Posts: 18,563
Likes: 0
From: A-320A
Default

Originally Posted by FlyinPiker
Actually I think 08' guys are hanging on as well. Don't see how this would effect anything though. In fact it would probably make it easier.

If we are going to be displacing off the 7ER (as is sounds) these guys could possibly go straight from the 7ER to the street without a stop on another piece of equipment (no need to train them for their new position or their replacement).

Not nailing the coffin shut that this is going to happen, just pointing out I don't think that particular point matters.

We're jumpin the gun till we hear something.
Correct.
They would just need to train a few positions on the 88 and 73N.
Reply
Old 06-12-2009 | 05:22 AM
  #63  
Banned
 
Joined: Feb 2008
Posts: 1,317
Likes: 0
From: The Beginnings
Default

Originally Posted by buzzpat
Guys,

I was furloughed in 01....just came back a year ago after deferring for a year. This is sounding (sadly) eerily familiar. This sucks.
Wow. A seven year furlough, with only one year added for a 1 year deferral. That IS food for thought.
Reply
Old 06-12-2009 | 05:32 AM
  #64  
Fly4hire's Avatar
Gets Weekends Off
 
Joined: Oct 2005
Posts: 911
Likes: 0
From: Left, left, left right left....
Default

Everyone take a deep breath - it is way too early to be talking furlough. Consider the following:

1) The down turn has to be considered more than short term to furlough - based on all previous models we are still short next summer

2) We will not know the results of the PRIP until mid-July

3) There a BUNCH of voluntary staffing mitigation programs used in the past that have not even been discussed yet - SLIP, PML, VL, VF, etc, not to mention reduced ALV's. They can also sweeten the PRIP to nab more as well.

If and when all those have been exhausted, AND they are still overstaffed, and the capacity reduction needs to be more permanent we might see the dreaded F.

At this point it would be a guillotine where they need a scalpel.

JMO....
Reply
Old 06-12-2009 | 05:49 AM
  #65  
iaflyer's Avatar
seeing the country...
15 Years
Gets Weekends Off
 
Joined: Oct 2006
Posts: 4,004
Likes: 35
From: 73N A
Default

Originally Posted by FlyinPiker
If we are going to be displacing off the 7ER (as is sounds) these guys could possibly go straight from the 7ER to the street without a stop on another piece of equipment (no need to train them for their new position or their replacement).
I see your point, but they would have furlough around 350 or 400 on the same bid to do this. There are a lot of MD88 people in that bottom 350-400. Although they are cutting back, there is the need to still fly that plane. Either way you cut it, it would take a LOT of training to do so.
Reply
Old 06-12-2009 | 06:16 AM
  #66  
Moderator
 
Joined: Oct 2006
Posts: 13,088
Likes: 0
From: B757/767
Default

Originally Posted by iaflyer
I see your point, but they would have furlough around 350 or 400 on the same bid to do this. There are a lot of MD88 people in that bottom 350-400. Although they are cutting back, there is the need to still fly that plane. Either way you cut it, it would take a LOT of training to do so.

And it would seem to me since most of the reduction is international WB flying they would be doing some serious MD88 training.
Reply
Old 06-12-2009 | 06:18 AM
  #67  
Moderator
 
Joined: Oct 2006
Posts: 13,088
Likes: 0
From: B757/767
Default

Originally Posted by buzzpat
Guys,

I was furloughed in 01....just came back a year ago after deferring for a year. This is sounding (sadly) eerily familiar. This sucks.

Hopefully it won't have the same result.
Reply
Old 06-12-2009 | 06:22 AM
  #68  
Superpilot92's Avatar
Underboob King
 
Joined: May 2005
Posts: 4,412
Likes: 0
From: Guppy Commander
Thumbs up

Originally Posted by Fly4hire
Everyone take a deep breath - it is way too early to be talking furlough. Consider the following:

1) The down turn has to be considered more than short term to furlough - based on all previous models we are still short next summer

2) We will not know the results of the PRIP until mid-July

3) There a BUNCH of voluntary staffing mitigation programs used in the past that have not even been discussed yet - SLIP, PML, VL, VF, etc, not to mention reduced ALV's. They can also sweeten the PRIP to nab more as well.

If and when all those have been exhausted, AND they are still overstaffed, and the capacity reduction needs to be more permanent we might see the dreaded F.

At this point it would be a guillotine where they need a scalpel.

JMO....
Exactly!! Well put
Reply
Old 06-12-2009 | 06:23 AM
  #69  
upndsky's Avatar
Gets Weekends Off
 
Joined: Jan 2008
Posts: 351
Likes: 0
From: Bebe Bus De L'Air Assistant Aerial Conveyance Facilitator
Default

Originally Posted by Fly4hire

2) We will not know the results of the PRIP until mid-July
I'm just curious how many guys who were ready to pull the trigger are now going to wait to see if the company sweetens the pot.
Reply
Old 06-12-2009 | 06:24 AM
  #70  
Free Bird's Avatar
Gets Weekends Off
 
Joined: Aug 2008
Posts: 799
Likes: 0
Default

Originally Posted by Fly4hire
Everyone take a deep breath - it is way too early to be talking furlough. Consider the following:

1) The down turn has to be considered more than short term to furlough - based on all previous models we are still short next summer

2) We will not know the results of the PRIP until mid-July

3) There a BUNCH of voluntary staffing mitigation programs used in the past that have not even been discussed yet - SLIP, PML, VL, VF, etc, not to mention reduced ALV's. They can also sweeten the PRIP to nab more as well.

If and when all those have been exhausted, AND they are still overstaffed, and the capacity reduction needs to be more permanent we might see the dreaded F.

At this point it would be a guillotine where they need a scalpel.

JMO....
Yeah, all of that. Plus, we have a NO-Furlough clause.
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Thread Tools
Search this Thread
Your Privacy Choices