Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   SkyWest (https://www.airlinepilotforums.com/skywest/)
-   -   Skywest v2.0 (https://www.airlinepilotforums.com/skywest/93589-skywest-v2-0-a.html)

ImPilot I Fly 08-29-2016 05:59 PM


Originally Posted by Kent (Post 2191253)
Which aircraft dominates Denver?

Probably a tie between the B-737 and the 1900. It's close.

Utah 08-29-2016 06:02 PM


Originally Posted by Kent (Post 2191253)
Which aircraft dominates Denver?

Staffing wise the CRJ by over a 3/1 margin. 180 to 50 or so on the FO side. This will change as the United crj 700s go away.

rvatornate 08-29-2016 07:39 PM


Originally Posted by hawk21 (Post 2190887)
See ya there. Hope you've been studying Sheppard Air :rolleyes:

Yep. That and the EPL stuff SKW sent. Having a blast, though, and looking forward to meeting everyone!

Porsche77 08-30-2016 05:22 AM

What Can one Realistically expect to make at Skywest First year ? and Second Year ?

WaterRooster 08-30-2016 07:20 AM


Originally Posted by Porsche77 (Post 2191496)
What Can one Realistically expect to make at Skywest First year ? and Second Year ?

Add 3 0's to the hourly rate. There is your estimate. It also applies to EVERY OTHER AIRLINE WHEN YOU WANT TO ESTIMATE PAY!


Enjoy

WesternSkies 08-30-2016 07:21 AM

Why, you can make a hat or a brooch or a pterodactyl...

rickair7777 08-30-2016 08:13 AM


Originally Posted by WaterRooster (Post 2191608)
Add 3 0's to the hourly rate. There is your estimate. It also applies to EVERY OTHER AIRLINE WHEN YOU WANT TO ESTIMATE PAY!


Enjoy

For second year and beyond, SKW bonuses and soft time (and 90+ hour months) add up such that a more accurate factor would be hourly rate x 1300. Assumes a line or flying a lot on reserve. If you could find a quite corner somewhere to sit reserve and not get called often you obviously won't make as much.

MKUltra 08-30-2016 08:46 AM

Question... A new hire FO, how long to hold TUS? I have a friend who lives in TUS and debating two companies.

Utah 08-30-2016 08:53 AM


Originally Posted by WaterRooster (Post 2191608)
Add 3 0's to the hourly rate. There is your estimate. It also applies to EVERY OTHER AIRLINE WHEN YOU WANT TO ESTIMATE PAY!


Enjoy

That's not really that accurate. Someone hired into the 175 a year ago and based in Chicago may not even get 950 hours while someone hired into the CRJ and based in MSP might hit 1100-1200. Per diem could be a couple hundred per month more as well.

WaterRooster 08-30-2016 11:22 AM


Originally Posted by Utah (Post 2191712)
That's not really that accurate. Someone hired into the 175 a year ago and based in Chicago may not even get 950 hours while someone hired into the CRJ and based in MSP might hit 1100-1200. Per diem could be a couple hundred per month more as well.

There is a key word in there.... its the word "estimate" haha


All times are GMT -8. The time now is 09:15 AM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands