![]() |
Speaking of crap shoots, in June they are planning to displace In the neighborhood of 200 md88 a’s and 200 md88 b’s in June which is gonna cause all kinds of wonky results. Some of those captains are up to the 4000’s
|
Originally Posted by 4fans
(Post 2962515)
Speaking of crap shoots, in June they are planning to displace In the neighborhood of 200 md88 a’s and 200 md88 b’s in June which is gonna cause all kinds of wonky results. Some of those captains are up to the 4000’s
|
Originally Posted by Redbird611
(Post 2961639)
January 7ER Fleet Newsletter, but I didn't read it to be that definitive. A few "most likely" will retire at their next heavy check instead of getting interior mods.
-We have 100 or so 757-200s today and in 2030, we will have a 100 or so still flying! All the -300s are staying as well. -We have 50 or so ERs and we may be down to 15 in 5 years. They are coming East for now -The A330 is an ER killer. -The plan is to replace the round dials/gauges with an integrated ADI and different ND |
Originally Posted by Cogf16
(Post 2962556)
I spoke to a 4th floor type about 2 months ago. He specifically stated
-We have 100 or so 757-200s today and in 2030, we will have a 100 or so still flying! All the -300s are staying as well. -We have 50 or so ERs and we may be down to 15 in 5 years. They are coming East for now -The A330 is an ER killer. -The plan is to replace the round dials/gauges with an integrated ADI and different ND |
Originally Posted by Cogf16
(Post 2962556)
I spoke to a 4th floor type about 2 months ago. He specifically stated
-We have 100 or so 757-200s today and in 2030, we will have a 100 or so still flying! All the -300s are staying as well. -We have 50 or so ERs and we may be down to 15 in 5 years. They are coming East for now -The A330 is an ER killer. -The plan is to replace the round dials/gauges with an integrated ADI and different ND |
Originally Posted by Xray678
(Post 2962547)
as of June there will be 395 M88 captains. Number 195 is seniority 5900.
|
Originally Posted by freezingflyboy
(Post 2962511)
Maybe (probably) I'm a moron, but I've been trying to wrap my head around a coherent bidding strategy for this AE. I'm currently sitting at about 50% DTW 7ER B. For me, the schedules are still decent (not a ton of int'l which is fine by me), the base works for me (easy commute/commuter friendly) and I like the plane. As long as the schedules don't get (more) trashed I'm perfectly happy where I'm at for the next 4-5 years. However, I would like to have a smart backup strategy for what to do if the category starts shrinking/changing out from under me. I guess what I'm wondering most is the best way to go about:
Is there an "AE/VD/MD Bidding Strategy" guide posted somewhere? I've poked around on the ALPA website and on Deltanet without much success. |
Originally Posted by 4fans
(Post 2962619)
yeah but they are supposedly taking the category down to 150 crews so I guess that would be 250 a displacements. Even worse.
|
Originally Posted by 4fans
(Post 2962515)
Speaking of crap shoots, in June they are planning to displace In the neighborhood of 200 md88 a’s and 200 md88 b’s in June which is gonna cause all kinds of wonky results. Some of those captains are up to the 4000’s
|
Originally Posted by Xray678
(Post 2962634)
fair enough. Number 145 would be seniority 4600. I suspect with all the 737 and 320 vacancies in this current bid, there will be a large number of 88 captains bidding off. That will help lower the number of displacements on the next bid.
|
| All times are GMT -8. The time now is 04:37 AM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands