![]() |
|
Originally Posted by Elvis90
(Post 1234047)
:mad: ... Grrrrr.....teeth grinding.... Is this allowed under the contract?
23.A.15. "Hard non-fly day means a non-fly day on which a pilot may not be inversely assigned to a rotation (e.g., vacation, APD day, reserve PD day, ALPA, legal duty, MLOA, or golden X-day)." Be advised that you can be rerouted into a Golden Day. A lot of times, crew tracking doesn't know that you are going into a golden day so if you do get rerouted, call them and explain the situation. Most times, they can find someone else. But, it is legal. |
Originally Posted by acl65pilot
(Post 1234173)
It has nothing to do with the TA. It has more to do with implementation of LOA 29 and the schedulers learning curves, which they are overcoming. A year ago we were utilizing twice as many reserves as planned. Part of the issue was reserve base utilization and the other part was breaking trips up, when that was not necessarily required. They have worked in these two areas and as a result, reserves are working more in line with where the company wants their utilization.
|
Originally Posted by dalad
(Post 1234243)
Once a trip is on your line that is the minimum for what you will get paid.
This is incorrect information. If you want a correct answer on scheduling issues you need to go to the DALPA committee section and post your question. You will get a QA's answer. I see so many wrong things posted contractually on here that I don't even bother to try and correct most of them. Short answer to the above question is there is only pay protection in the month the trip originates. Anything that spills over into the following month has no protection until after the carry out trips are adjusted in the following months bid package. You could bid a 4 day trip worth 24 hours and end up getting only paid for the first day if the trip is modified and flying dropped in the following month. Even if it flies as a 4 day the value can be reduced and you get no protection on the spill over portion. |
Originally Posted by nyc7erb
(Post 1234429)
Be advised that you can be rerouted into a Golden Day. A lot of times, crew tracking doesn't know that you are going into a golden day so if you do get rerouted, call them and explain the situation. Most times, they can find someone else. But, it is legal.
|
Originally Posted by TheWagman
(Post 1234474)
Ok.... So what's the point of having a golden day then?
|
Originally Posted by sailingfun
(Post 1234455)
This is incorrect information. If you want a correct answer on scheduling issues you need to go to the DALPA committee section and post your question. You will get a QA's answer. I see so many wrong things posted contractually on here that I don't even bother to try and correct most of them.
Short answer to the above question is there is only pay protection in the month the trip originates. Anything that spills over into the following month has no protection until after the carry out trips are adjusted in the following months bid package. You could bid a 4 day trip worth 24 hours and end up getting only paid for the first day if the trip is modified and flying dropped in the following month. Even if it flies as a 4 day the value can be reduced and you get no protection on the spill over portion. |
Originally Posted by TheWagman
(Post 1234474)
Ok.... So what's the point of having a golden day then?
|
Surprised that more hasn't been said about the downfall of our late, great friend Bill Lumburg, considering he was one of the TAs biggest cheerleaders on here. Obviously it was a false-flag disinformation campaign...but on behalf of whom? Management? ALPA? RAA? Or was he some regional guy who really really wanted a shot at flying more 90 seaters?
The silence from shiznit in particular is deafening considering how many times he told me to go back to playing in the regional forum sandbox because I'm not a Delta pilot :rolleyes:. |
Originally Posted by johnso29
(Post 1234483)
They're pointless. Inviolate days at NWA were much better. There is zero penalty to scheduling for rolling a reserve into a Golden Day. It's basically impossible to make solid plans on days off as a reserve.
But you have to tell crew tracking, they don't know about your schedule, they only know about the trip you're on. |
Originally Posted by iaflyer
(Post 1234499)
I disagree - in 3 years on reserve, I've never been forced to work on an X day or a Golden day. Once, there was a mechanical and I was going to be extended (rerouted I guess) into a golden day. I just called Crew Tracking, told them (as it says in When Scheduling Calls) and within 30 minutes I was going to get home as originally scheduled.
But you have to tell crew tracking, they don't know about your schedule, they only know about the trip you're on. But this is also the airline industry. If you are scheduled to finish a trip with a "penalty lap" to an outlying station and you break hard up at FNT (or wherever), guess what? You may end up getting stuck overnight and flying into your vacation, etc. But Crew Tracking can not actually reroute you in advance to do that. |
| All times are GMT -8. The time now is 08:22 AM. |
|
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands