Any "Latest & Greatest" about Delta?
It sounds like they want people to take a LOA for the month of September. I am still confused as to what this entails.
I though that too, and maybe they do, but this is the preposition of notices. I will look at it again(did not look that closely) but it could also be the Zero pay option that we agreed to aver the SIL's were seen as non-economical.
I'm sure when we start hiring, Boomer will find with his great attitude many DAL pilots he has never met face to face will be willing to walk his stuff in. Never under estimate the goodwill from the pilots on this board. I wouldn't be where I am today without this forum and another unknown pilot.
Sorry to all those other Comair pilots and their families. Been in your shoes before and it is nothing short of scary.
Sorry to all those other Comair pilots and their families. Been in your shoes before and it is nothing short of scary.
Well I guess I need to get a copy of this new contract so I can look things up myself. Thanks.
:-)
Joined APC: Feb 2007
Posts: 7,339
If the Comair planes come to Pinnacle so will the Comair pilots.
I was thinking about this the last few days, and wondered if they are shutting OH down now so that they can acquire 9E in CH11. End result would be no need to swap 70's for 50's and effectively have no CPA with 9E. Allows them to reduce the DCI footprint without redoing the SKW/EV CPA's. Shut down OH now so that early next year they can buy 9E and start the reduction.
*The 70's that would be used to do the purported agreed to swap out in the 9E CH11 CPA (*AWST) would be from SKW and EV. If they (SKW Holdings) are unwilling to redo their CPA's, they will not have jets that they can swap out with 9E. The 76 seat airframes need to be used elsewhere so this one-two may be the work around they have come up with.
Just a random thought.
:-)
Joined APC: Feb 2007
Posts: 7,339
I was thinking about this the last few days, and wondered if they are shutting OH down now so that they can acquire 9E in CH11. End result would be no need to swap 70's for 50's and effectively have no CPA with 9E. Allows them to reduce the DCI footprint without redoing the SKW/EV CPA's. Shut down OH now so that early next year they can buy 9E and start the reduction.
*The 70's that would be used to do the purported agreed to swap out in the 9E CH11 CPA (*AWST) would be from SKW and EV. If they (SKW Holdings) are unwilling to redo their CPA's, they will not have jets that they can swap out with 9E. The 76 seat airframes need to be used elsewhere so this one-two may be the work around they have come up with.
Just a random thought.
*The 70's that would be used to do the purported agreed to swap out in the 9E CH11 CPA (*AWST) would be from SKW and EV. If they (SKW Holdings) are unwilling to redo their CPA's, they will not have jets that they can swap out with 9E. The 76 seat airframes need to be used elsewhere so this one-two may be the work around they have come up with.
Just a random thought.
Another reason is to be cleaning up their balance sheet and taking goodwill write-offs now in the preparation for a acquisition/merger that may or may not include a wholly owned subsidiary. Solves possible integration issues down the road as well.
Mesaba,
Becoming an "exclusive" DCI carrier would lead credence to becoming wholly owned though.
*Also note when Colgan is being shut down, and the expeditious manner they are being parked as well.
Mesaba,
Becoming an "exclusive" DCI carrier would lead credence to becoming wholly owned though.
*Also note when Colgan is being shut down, and the expeditious manner they are being parked as well.
Whatever is happening, its happening at an alarming pace. Like ACL65 said, the acceleration of the Q's, management leaving the negotiating table and not starting up again, and the Shut Down of Comair. I myself about less than a year ago did not see that bad of news coming for pinnacle but now it becomes real seeing comair shut down.
Also I believe they just pushed back our deadline to exit bankruptcy with the DIP financing to January of 2013 for final approval. I believe that is 3 months later than it was.
Also I believe they just pushed back our deadline to exit bankruptcy with the DIP financing to January of 2013 for final approval. I believe that is 3 months later than it was.
Can't abide NAI
Joined APC: Jun 2007
Position: Douglas Aerospace post production Flight Test & Work Around Engineering bulletin dissembler
Posts: 11,990
The 717's will not arrive for nearly a year. The CRJ900's to follow. In the mean time we are pulling down the reach of the DCI system and thus, the Delta network.
Events of the last couple of weeks suggest the plan for New York needs a serious re-think due to ATC limitations.
Events of the last couple of weeks suggest the plan for New York needs a serious re-think due to ATC limitations.
Thread
Thread Starter
Forum
Replies
Last Post