![]() |
|
Originally Posted by cni187
(Post 1373945)
So are we starting the pool on when the awards come out? Put me down for the 19th at 1600.
|
Originally Posted by 80ktsClamp
(Post 1373949)
Put me down for 3 intertoobz at 1100 on the 21st
|
I think I might go 22 @1659. There are A LOT of displacements on this one.
The 717 is the most loved a/c in the fleet apparently. 216 senior to 116## want B and 987 want A with 360 as a #1 choice for that 4th stripe. In fact there are over 300 more pilots with a 717A in than there are 777A. Realist I guess :D |
Originally Posted by Timbo
(Post 1373969)
What time on the 18th does it close? I'll go for 48hrs. after it closes, but it could be longer, if there's a whole bunch of displacing that needs to be double checked. :rolleyes:
|
Originally Posted by XtremeF150
(Post 1373976)
I think I might go 22 @1659. There are A LOT of displacements on this one.
The 717 is the most loved a/c in the fleet apparently. 216 senior to 116## want B and 987 want A with 360 as a #1 choice for that 4th stripe. In fact there are over 300 more pilots with a 717A in than there are 777A. Realist I guess :D |
Originally Posted by Flamer
(Post 1373775)
Glad you are hoping for mandatory displacements.
|
Originally Posted by johnso29
(Post 1374001)
Nice to see you twisting my words to your advantage. It's obvious I'm hoping the company's shameless attempt to get people to AE/VD to the 717 backfires in their faces. Your avatar/username is appropriate. :rolleyes:
Historically, they will do everything they can to prevent major cascades from the displacements (but you don't put any credence into my calling them out on saying they will put out bids more frequently while the next bid is planned to be farther spaced out.... ;) ), so they will run this thing to minimize training. What that will be... talk about a total crapshoot. I'm less than impressed with the prospects so far... perhaps maybe a bit of restoration for some from 5 years ago and more lower paying positions for others. |
Originally Posted by 80ktsClamp
(Post 1374002)
That's the way I read it.
Historically, they will do everything they can to prevent major cascades from the displacements (but you don't put any credence into my calling them out on saying they will put out bids more frequently while the next bid is planned to be farther spaced out.... ;) ), so they will run this thing to minimize training. What that will be... talk about a total crapshoot. I'm less than impressed with the prospects so far... perhaps maybe a bit of restoration for some from 5 years ago and more lower paying positions for others. It's obvious the company is desperate for AE/VD bids to the 717. Personally, I'm hoping they pay for delaying hiring by being unable to minimize displacements. I'm glad someone can see the good intention behind my ill will. |
I changed my mind about the 717B. I'll let the company MD me to it so I won't incur the training freeze. I'll get it anyway based on the process as has been discussed here.
|
SDs weekly update I think mentioned 3 days or so. I'm going with 1600/22nd.
|
| All times are GMT -8. The time now is 07:44 PM. |
|
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands