![]() |
Turn them phones off fellas. Days off are sacred.
|
Originally Posted by seattlepilot
(Post 2068749)
I love it how you guys agreed to a crap contract and now complain about people picking up open time. We told you that the rates were crap and capped 4 year pay was bad. Did you listen ?
You made this bed.. You need to lay in it. |
Originally Posted by spaaks
(Post 2069249)
+1. I love seeing you little b****** whine
|
But what about the "best scheduling flexibility in the industry?"
|
Originally Posted by gold
(Post 2069260)
But what about the "best scheduling flexibility in the industry?"
The catch is, AAG will have to fix the pay scale and the 12/4 in the next year or so, or shut PSA down. Everyone knew that when it was voted in. The bad parts of the contract will be gone. How is that a loss for pilots? Critical pay made PSA the highest paying regional in the industry, and the SAP made the schedules very flexible. The company stole critical pay away. |
Originally Posted by CLT Guy
(Post 2069262)
PSA's contract actually has some parts that are heads and shoulders above the rest of the industry. There are bad parts as well.
The catch is, AAG will have to fix the pay scale and the 12/4 in the next year or so, or shut PSA down. Everyone knew that when it was voted in. The bad parts of the contract will be gone. How is that a loss for pilots? Critical pay made PSA the highest paying regional in the industry, and the SAP made the schedules very flexible. The company stole critical pay away. |
Originally Posted by penaltybox
(Post 2069278)
Why in Gods holy trousers will they shut PSA down? That makes less than 0 sense.
PSA will be forced to raise pay, or they will not be able to attract any new hires. |
Originally Posted by CLT Guy
(Post 2069281)
They won't. They will need to raise pay. That was my point.
PSA will be forced to raise pay, or they will not be able to attract any new hires. |
Originally Posted by joek
(Post 2068987)
Open time ( SAP) is left over crap that was put together and was never part of any line. Join the Sch committee and see how it's done.
|
Originally Posted by gold
(Post 2069260)
But what about the "best scheduling flexibility in the industry?"
|
| All times are GMT -8. The time now is 04:18 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands