Search

Notices
Air Wisconsin Regional Airline

Air Wisconsin

Thread Tools
 
Search this Thread
 
Old 05-30-2017 | 03:58 AM
  #5781  
Gets Weekends Off
 
Joined: Mar 2016
Posts: 1,906
Likes: 0
From: Here and there
Default

Originally Posted by walleye
I'm buying a new luggage works carry-on bag. What do you guys recommend?

A) Luggage Works-Stealth Aviator
B) Luggage Works-Computer Front Stealth 22
C) Luggage Works-Stealth Suiter 22
D) Something else

Is the 22 big enough or should I go for the 26 inch?

Thanks.
The 22 plastic version is equal to or even better than the 22 metal one. The plastic erosion holds up just as well and it's 5 pounds lighter. That weight savings is definitely noticeable.
Reply
Old 05-30-2017 | 04:00 AM
  #5782  
Gets Weekends Off
 
Joined: Feb 2016
Posts: 107
Likes: 0
Default

Originally Posted by walleye
I'm buying a new luggage works carry-on bag. What do you guys recommend?

A) Luggage Works-Stealth Aviator
B) Luggage Works-Computer Front Stealth 22
C) Luggage Works-Stealth Suiter 22
D) Something else

Is the 22 big enough or should I go for the 26 inch?

Thanks.
22" has been fine for me. Have lived out of it for 3 weeks at a time at a previous job. I have the cooler bag as well, not sure of the model. It's large enough for a lot of food, my large Apple lap top, and flight gear, and a Light Speed headset. That's all the luggage I carry.

I got the metal frame. Starting to see some bend after 14 months, although not much. It's heavy. I'd go with the plastic frame if I had it to do over.
Reply
Old 05-30-2017 | 05:31 AM
  #5783  
el jefe's Avatar
Tier 3 Candidate
 
Joined: Jun 2007
Posts: 609
Likes: 0
From: Canadair Gosh
Default

IMHO the 26" is overkill unless you're tall or wide and have big clothes. Remember that if you stuff the side pockets too full it becomes hard to close the overhead bin.
Reply
Old 05-30-2017 | 04:58 PM
  #5784  
gndtoair7s's Avatar
On Reserve
 
Joined: Feb 2016
Posts: 13
Likes: 0
From: A320F/O
Default Ord base

Hello everyone, I was wondering when the ord base opens if it will go jr/sr for f/o? I will be in the June class and just looking at bases ..thanx
Reply
Old 05-30-2017 | 05:02 PM
  #5785  
Gets Weekends Off
 
Joined: Apr 2015
Posts: 240
Likes: 0
Default

Originally Posted by gndtoair7s
Hello everyone, I was wondering when the ord base opens if it will go jr/sr for f/o? I will be in the June class and just looking at bases ..thanx
Fall 2018 is what was announced on the Facebook page. It will be junior for FOs and senior for captains.
Reply
Old 05-30-2017 | 05:28 PM
  #5786  
Gets Weekends Off
 
Joined: Aug 2015
Posts: 237
Likes: 0
Default

Originally Posted by Fleron270
Fall 2018 is what was announced on the Facebook page. It will be junior for FOs and senior for captains.
Fall 2017. Our transition will be all but complete by 2018
Reply
Old 05-30-2017 | 08:28 PM
  #5787  
Line Holder
 
Joined: Dec 2016
Posts: 79
Likes: 0
Default

Does anyone have any insight of when ALL these new hires are going to start class. It would be great if we finally upgraded the guys that got awarded captain last year.
Reply
Old 05-31-2017 | 02:30 AM
  #5788  
Gets Weekends Off
 
Joined: May 2017
Posts: 171
Likes: 0
Default

I can give you a small snapshot from the group I interviewed with last week. Earliest date offered was June 25, and I believe several people took it. Myself and at least one other person took late August/early September dates, although I'm hoping to be able to take an earlier class if I can make it work with my career transition from my "normal" job and cross country move to my wife's new post with the Army.

We were told to expect 6 weeks in Appleton (5 for those that already have an ATP) for systems/CPT followed by 2 weeks of sims with IOE to follow. Best case would probably be 3-4 months from start of class to off IOE.
Reply
Old 05-31-2017 | 05:13 AM
  #5789  
Line Holder
 
Joined: Apr 2017
Posts: 27
Likes: 0
Default

Any ideas how many have been hired since the big announcement with UAL?
Reply
Old 05-31-2017 | 06:07 AM
  #5790  
Line Holder
 
Joined: Dec 2016
Posts: 79
Likes: 0
Default

as of today on crew availability, it says we have 17 in training however as of tomorrow 13. I don't know if this means 4 are completing IOE today and then are now on the line or they have 4 resigning tomorrow because they didn't make it through. All that being said, taking 17 still doesn't cover attrition from the last three months. That number represents all those in training; CTP, indoc, systems, CPT, sims. I am not sure about IOE. I would venture to guess it does include them, but who knows. Still 17 new hires in a 3 month footprint doesn't look that great if we are interviewing even 30 per month.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Duksrule
Hangar Talk
4
11-09-2011 06:56 AM
freightdog
Regional
64
12-03-2009 02:17 PM
Jurassic Jet
Cargo
26
11-15-2007 07:16 AM
flystraightin
Major
4
05-31-2006 06:31 AM
Sir James
Hangar Talk
0
08-04-2005 04:31 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices