![]() |
|
Originally Posted by Sink r8
(Post 1289992)
BTW, you guys predicting AE results by "COB, today" make sense, but does "COB" refer to the actual time B C, or later in the day like 5PM?
|
I was so hoping we would see the AE results today. 430pm now and the resources people have gone home. Why didn't they close this bid at 10am yesterday so they could have worked on it earlier?
So now they'll have it out monday at 11am,2 hours after showing up for work. Really, they can't finish this up now? No problem if we're delayed two hours before we can go home... |
Originally Posted by forgot to bid
(Post 1289998)
are there no back door ways to see AE results?
|
Originally Posted by Dc8co
(Post 1290001)
I was so hoping we would see the AE results today. 430pm now and the resources people have gone home. Why didn't they close this bid at 10am yesterday so they could have worked on it earlier?
So now they'll have it out monday at 11am,2 hours after showing up for work. Really, they can't finish this up now? No problem if we're delayed two hours before we can go home... I think it gets a little trickier when you have to manually decide what to backfill, what open positions to withdraw, and what displacements to allow. All speculation on my part, but I think all AE's are tweaked, and tweaked. Nothing illegal, because the contract is far too permissive on this topic. |
Originally Posted by Dc8co
(Post 1290001)
I was so hoping we would see the AE results today. 430pm now and the resources people have gone home. Why didn't they close this bid at 10am yesterday so they could have worked on it earlier?
So now they'll have it out monday at 11am,2 hours after showing up for work. Really, they can't finish this up now? No problem if we're delayed two hours before we can go home... Gunfighter and Sink are on the mark. The number of pilots they hold and allow to backfill make all the difference in the displacement pin action. |
In the old days it always took them a bunch of days,now even with major displacements it takes them a day at the most.
That's why I said if they had closed the bid at 10am yesterday instead of 3pm yesterday,we could have seen the results today. But why would they care right? I think the resources people are more busy planning their roadshow in NRT on 12-14 nov. |
Originally Posted by forgot to bid
(Post 1289998)
are there no back door ways to see AE results?
|
Originally Posted by CheapTrick
(Post 1289940)
Training Department rumor: 3 CRJ50 to 1 A321 deal in 2013 with Airbus. They take 3 rj's and we buy 1 A321. Characterized as a "small" order. That's all. Throw no stones.
|
Grrrr. Must get the AE
Man this is worse than Christmas as a kid waiting to see whether i got anthracite or Bituminous. .. ... And just the same. Expecting lump of coal and hoping for socks if I'm lucky. |
Well, let's say the first run produced massive MDs. I'm sure they're now just trying to make decisions on how they want to handle that and say run some categories, say the ER, fat?
Just a hunch but everyone loves their 757/767. My hunch is these senior ATL 767 guys go to the ER. ER guys would then get displaced and most likely to airplanes they can hold. And knowing that these pilots will bid back to the 757/767 ASAP, then they know they'll have to pay for two training cycles per MD'd ER pilot. That cost cash, which is just money. So what's the ROI on MDing an ER pilot to the 73 vs keeping them on the ER? I'm frankly surprised they'd be able to get it out in a day. Hope they do so pilots don't wait around til Monday. I think that's kind of crappy given that it's MDs. Which is all we seem to do anymore. |
| All times are GMT -8. The time now is 02:51 PM. |
|
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands