Go Back  Airline Pilot Central Forums > Airline Pilot Forums > Major > Delta
Any "Latest & Greatest" about Delta? >

Any "Latest & Greatest" about Delta?

Search

Notices

Any "Latest & Greatest" about Delta?

Thread Tools
 
Search this Thread
 
Old 05-27-2014 | 11:10 AM
  #158791  
forgot to bid's Avatar
veut gagner à la loterie
 
Joined: Apr 2008
Posts: 23,286
Likes: 0
From: Light Chop
Default

Originally Posted by georgetg
Yup, good to see some more 757 routes being added.
We also did cancel the planned 717/RJ Houston expansion due to lack of gates...

cancelled:

CXL HOU-DTW (3 daily were planned)
CXL HOU-LAX (5 daily were planned)
CXL HOU-LGA (g daily were planned)
CXL HOU-MSP (3 daily were planned)

we do keep the additional 6th daily HOU-ATL

Cheers
George
Gates are hard to come by there. That's for sure. But was HOU-LAX going to be 717?

If so it didn't take long to poke SWA in the eye with their 717s.
Old 05-27-2014 | 11:13 AM
  #158792  
forgot to bid's Avatar
veut gagner à la loterie
 
Joined: Apr 2008
Posts: 23,286
Likes: 0
From: Light Chop
Default

Originally Posted by shiznit
The entire duty period would have paid 7:30.

The "credit" would have been based on the 1:2 and 1:1.75 rig. The pay only would have been the difference between that and 7:30.

For reserves the "pay" would have gone above Res. Guar. Which would have been sweet for reserves...

I'm still in the camp that we should allow them, but with a little bit tighter rules...

1:30 block each way
5:30 min scheduled break
4:30 behind the door
8:00 pay per period
"Day room" hotel in between SDP's
Thanks.

I was talking to someone about it and they brought up a question, would these 7.30 trips have replaced 10.5 hour two days?
Old 05-27-2014 | 11:24 AM
  #158793  
forgot to bid's Avatar
veut gagner à la loterie
 
Joined: Apr 2008
Posts: 23,286
Likes: 0
From: Light Chop
Default

I'm going through Section 23 of the PWA when it comes to carry out GS trips. I'm trying to figure out how the pay works. The 4-day trip in particular that was thinking about has 9.27 of credit in this month and the remaining 13+ hours in next month (at least according to the bid packages).

So is it 9.27 on GS in May and 13+ in June? Someone mentioned that you could ask to move all of the hours to the originating month but I don't see that in the PWA.
Old 05-27-2014 | 11:34 AM
  #158794  
Hillbilly's Avatar
Line Holder
 
Joined: Oct 2013
Posts: 972
Likes: 1
From: 7ERA
Default

Originally Posted by Carl Spackler
Hmmm, flamebait. Ironic.



Which is why I didn't call because my guys would have felt obligated to call back. I wanted them to enjoy a few days peace.

Anyway, had a good conversation with my rep today. Here's a quick synopsis:

1. CDO's originated from a special select sub committee of the scheduling committee, not a 4 year old defeated LEC resolution. The subcommittee inserted CDO's into the negotiating wish list. Reps found out about CDO's during their initial meetings to give direction. The reps' direction included strict limitations and provisions to any CDO's. the TA did not include those limits. Reps that were upset about their guidance being ignored were bolstered by a nearly record flood of angry emails and calls. After initially fighting the MEC, the NC went back to the company and made the changes.

2. No mention of a pay no credit lookback between now and November.

3. MEC nearly equally split on need for MEMRAT. interesting that its a philosophical split and not a split along north/south.

4. Acknowledgement that given the volumes of MEC communication, pilots were not communicated with regarding what was being negotiated.

5. The logic as to how CDO's became part of 117 (fatigue regulations) negotiations was because CDO's are covered in FAR 117. This was the open door used by the scheduling subcommittee to insert them into our opening position.

6. Company considered CDO's to be zero cost. Yet when we returned to ask for removal of them, the company gave their removal from the already signed TA to cost $4 million. So the loss of one hour to the long call leash and other stuff was determined by the company to be required to make them whole for their new additional cost of 4 million to remove CDO's that were a zero cost item when negotiations began.

Lots more stuff but this is already too long. MEC still very divided philosophically between guys like the CVG chairman who openly stated: 'we don't need MEMRAT because pilots don't have the time or the knowledge capacity to understand this stuff. That's why they hire us' ... and guys who believe just the opposite. No changes to that seen anytime soon

Carl
This "special select subcommittee" to the scheduling committee intrigues me. There are very few subcommittees to the scheduling committee (PBS, RCC, ?). The FRMT is now under the safety umbrella and not scheduling. Did the rep mention what subcommittee it was?
Old 05-27-2014 | 11:38 AM
  #158795  
80ktsClamp's Avatar
Da Hudge
 
Joined: Oct 2006
Posts: 17,473
Likes: 0
From: Poodle Whisperer
Default

Originally Posted by Carl Spackler
Hmmm, flamebait. Ironic.



Which is why I didn't call because my guys would have felt obligated to call back. I wanted them to enjoy a few days peace.

Anyway, had a good conversation with my rep today. Here's a quick synopsis:

1. CDO's originated from a special select sub committee of the scheduling committee, not a 4 year old defeated LEC resolution. The subcommittee inserted CDO's into the negotiating wish list. Reps found out about CDO's during their initial meetings to give direction. The reps' direction included strict limitations and provisions to any CDO's. the TA did not include those limits. Reps that were upset about their guidance being ignored were bolstered by a nearly record flood of angry emails and calls. After initially fighting the MEC, the NC went back to the company and made the changes.

2. No mention of a pay no credit lookback between now and November.

3. MEC nearly equally split on need for MEMRAT. interesting that its a philosophical split and not a split along north/south.

4. Acknowledgement that given the volumes of MEC communication, pilots were not communicated with regarding what was being negotiated.

5. The logic as to how CDO's became part of 117 (fatigue regulations) negotiations was because CDO's are covered in FAR 117. This was the open door used by the scheduling subcommittee to insert them into our opening position.

6. Company considered CDO's to be zero cost. Yet when we returned to ask for removal of them, the company gave their removal from the already signed TA to cost $4 million. So the loss of one hour to the long call leash and other stuff was determined by the company to be required to make them whole for their new additional cost of 4 million to remove CDO's that were a zero cost item when negotiations began.

Lots more stuff but this is already too long. MEC still very divided philosophically between guys like the CVG chairman who openly stated: 'we don't need MEMRAT because pilots don't have the time or the knowledge capacity to understand this stuff. That's why they hire us' ... and guys who believe just the opposite. No changes to that seen anytime soon

Carl
Much better. Thanks, Carl.
Old 05-27-2014 | 11:50 AM
  #158796  
Humboldt's Avatar
Gets Weekends Off
 
Joined: Jul 2007
Posts: 225
Likes: 0
From: 73
Default

Quick Q: Is there any other way to travel on our JV partners than simply buying an eZed? On travel net, all those flights with JV partner legs have non-selectable radio heads.

Do we get any preferential boarding on JV partners as Delta employees or is standard eZed with the masses the only way to go?

Gracias!

Humboldt
Old 05-27-2014 | 11:57 AM
  #158797  
Alan Shore's Avatar
Gets Weekends Off
 
Joined: Oct 2013
Posts: 1,299
Likes: 0
Default

Originally Posted by forgot to bid
I'm going through Section 23 of the PWA when it comes to carry out GS trips. I'm trying to figure out how the pay works. The 4-day trip in particular that was thinking about has 9.27 of credit in this month and the remaining 13+ hours in next month (at least according to the bid packages).

So is it 9.27 on GS in May and 13+ in June? Someone mentioned that you could ask to move all of the hours to the originating month but I don't see that in the PWA.
Ability to move time from next month into this comes into play if some of this month's trip is cancelled and your rotation guarantee winds up paying next month. In that event, you can move that time back to restore this month.

With your GS, you'll get 9:27 GS pay in May and the rest in June. The specifics of the GS depend on whether you are reserve or regular.
Old 05-27-2014 | 12:00 PM
  #158798  
Bucking Bar's Avatar
Can't abide NAI
 
Joined: Jun 2007
Posts: 12,078
Likes: 15
From: Douglas Aerospace post production Flight Test & Work Around Engineering bulletin dissembler
Default

Originally Posted by forgot to bid
I'm still a little bit in the fog as to the CDO incident. The mere fact that it was pulled begs the question as to why it was there in the first place and the language (and protections) not seen. I'm still trying to figure out those two things.

This kind of change to work rules and operations seemed to me to be as big as any contract TA would be. Whether it went to memory rat or not I think the language deserved time to review.

And that's what confuses me. I think for most who signed a DPA card it was more about DALPA having a conflict of interest or being self serving and secretive and that maybe there needed to be a change. But over the last year it's really died down as the DPA shot itself in the foot on occasion and then you had elections at DALPA, followed by a recall, followed by new people. I think for those of us who filled out a DPA card there is a willingness to give DALPA the benefit of the doubt moving forward.

So what I don't get is if DALPA wanted to finally rid itself of the DPA why go this route on this kind of TA at this time? Not publishing the language is secretive, publishing it is not secretive. And why didn't they understand there would be an uproar about CDOs even if some pilots really demanded it?
The Delta MEC Policy Manual is available on the ALPA / DMEC web site and downloaded in your document library if you used the iPubs or Box. If you understand the system, things worked like they were supposed to. We do not routinely memrat agreements unless it is the result of Section 6 bargaining. Our MEC could, but most view the MEC as a representative democracy and reps expect to take responsibility for the job by casting their vote.

I suggest those with a concern about memrat first address the policy manual and change it through resolution, if change is desired. Otherwise accept that your rep is going to do his or her job.

The reps can send an agreement to memrat and were going to if CDOs were in there. If that would have happened, it would have been a rare exception to how the MEC usually goes about it's business.

As for the negotiations, they were a bit unusual due to their scope. This was certainly one of the largest agreements ever reached outside of formal Section 6 negotiations. But since it was not Section 6 some of the polling and surveys were not budgeted or completed.

I thought the MEC functioned very well. A side effect of a more open, transparent and inclusive MEC is the occassional glimpse of the untidy side of sausage making. But the payoff of having the MEC respond quickly to pilot input is terrific, IMHO.

Again, if there are suggestions for improvements, lets discuss them and improve the policy manual that provides guidance.
Old 05-27-2014 | 12:05 PM
  #158799  
Timbo's Avatar
Runs with scissors
 
Joined: Dec 2009
Posts: 7,847
Likes: 0
From: Going to hell in a bucket, but enjoying the ride .
Default

Wayyy off topic here, but does anyone know what the American Airlines 777 Capt. pay rate is now, and next year?

A friend of a friend asked me, but I can't find it listed here on APC.

Anyone who knows for sure, please shoot me a PM. Thanks.
Old 05-27-2014 | 12:14 PM
  #158800  
Line Holder
 
Joined: Feb 2009
Posts: 851
Likes: 0
Default

Originally Posted by georgetg
Yup, good to see some more 757 routes being added.
We also did cancel the planned 717/RJ Houston expansion due to lack of gates...

cancelled:

CXL HOU-DTW (3 daily were planned)
CXL HOU-LAX (5 daily were planned)
CXL HOU-LGA (g daily were planned)
CXL HOU-MSP (3 daily were planned)

we do keep the additional 6th daily HOU-ATL

Cheers
George
I think you mean DAL not HOU.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
On Autopilot
Regional
22617
11-05-2021 07:03 AM
AeroCrewSolut
Delta
153
08-14-2018 12:18 PM
Bill Lumberg
Major
71
06-13-2012 08:36 AM
Quagmire
Major
253
04-16-2011 06:19 AM
JiffyLube
Major
12
03-07-2008 04:27 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices