![]() |
|
Originally Posted by crewdawg
(Post 3076036)
I don't take myself or anything on here too seriously. I certainly did not intend to patronize and/or belittle you, and I apologize if it came off that way. Thank you for your efforts for the pilots at Delta.
|
Bs for July are out.
|
Originally Posted by fishforfun
(Post 3076202)
Bs for July are out.
|
Originally Posted by myfingershurt
(Post 3076220)
maybe they can rerun those as well?
characters |
I used to be based in LAX, Is Delta using this time of low gate demand to smash apart terminal 3 and fast track the rebuild?
|
Originally Posted by Humboldt
(Post 3076287)
I used to be based in LAX, Is Delta using this time of low gate demand to smash apart terminal 3 and fast track the rebuild?
|
Originally Posted by Humboldt
(Post 3076287)
I used to be based in LAX, Is Delta using this time of low gate demand to smash apart terminal 3 and fast track the rebuild?
Not being trite, but I cant imagine Delta could reschedule a project that has been in the works for years Eff permits. Eff workers. Eff budgets....OSHA, yea them too ..you get the jist Maybe in a perfect world. But it sounds like a good idea...I agree with that...but prolly a bridge too far |
Originally Posted by Buck Rogers
(Post 3076329)
Not being trite, but I cant imagine Delta could reschedule a project that has been in the works for years Eff permits. Eff workers. Eff budgets....OSHA, yea them too ..you get the jist
Maybe in a perfect world. But it sounds like a good idea...I agree with that...but prolly a bridge too far They absolutely have. https://thepointsguy.com/news/delta-...rt-renovation/ |
Originally Posted by 4fans
(Post 3076331)
So yes, making a project take 1/4 the time, provided it's shut down and empty other than my crew was often realistic. There's a lot of extra work in not disturbing people not involved when things have to get done. If you have the run of the land, you can get stuff done fast and safe, and correct. Prime example. Think of renovating a one bathroom house, while having to keep the bathroom at least "usable" by the end of the work day. Lots of repeated work to keep a toilet and shower usable. And it limits your options for shower replacement to basically prefab fiberglass that can be put in place in a shift. Now think of a two bath house. You can basically shut down the one, gut it, and it actually goes faster because you don't have to bring it up to a basic function every day. Much easier when the kids are at the other parents for the summer, but still workable. We're basically in our two terminal places, in a situation where the kids went to their mothers for the summer, it's just you and the wife/husband, and it's no big drama to go down to one bathroom. |
Originally Posted by Humboldt
(Post 3076287)
I used to be based in LAX, Is Delta using this time of low gate demand to smash apart terminal 3 and fast track the rebuild?
|
| All times are GMT -8. The time now is 07:51 PM. |
|
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands