Go Back  Airline Pilot Central Forums > Retired Airlines > ExpressJet
Will ExpressJet survive this? >

Will ExpressJet survive this?

Search

Notices
ExpressJet Regional Airline

Will ExpressJet survive this?

Thread Tools
 
Search this Thread
 
Old 05-01-2020 | 06:20 PM
  #551  
Gets Weekends Off
 
Joined: Sep 2011
Posts: 707
Likes: 0
From: lav dumper
Default

Originally Posted by SeeYa
thats not how any of this works
Please do enlighten us. It's my understanding United owners the a/c, we sublease the aircraft and pay for maintenance. In turn we get paid by block hour and other performance bonuses. This is a snippet from the 2015 modified Capacity Purchase Agreement when we were held by INC. Obviously being a private company now, that info isn't public. But it may be buried in a United filing, I just don't feel like looking, these things aren't easy to find. There were provisions in the old CPA that said due to mass grounding the payment is abated but I'm not sure what the new one entails.

https://www.sec.gov/Archives/edgar/d...1zex-10_22.htm

Covered Aircraft Sublease — means the Amended and Restated Covered Aircraft Sublease (or a lease) substantially in the form of the Exhibit B (or as otherwise agreed or amended) between United and Contractor, pursuant to which Contractor subleases (or leases) a Covered Aircraft from United.

Aircraft Sublease for each Covered Aircraft in the form attached hereto as Exhibit B. Until Contractor and United enter into a Covered Aircraft Sublease, the currently applicable lease or sublease for a Covered Aircraft shall be deemed amended to conform to the form of Covered Aircraft Sublease attached hereto as Exhibit B together with such changes thereto as necessary to conform to the applicable head lease, including without limitation the identity of the owner trustee, owner participant, financing parties, amount of basic rent and stipulated loss value; provided, that any such conforming changes shall not increase the obligations of Contractor under such Covered Aircraft Sublease as otherwise provided in the form of agreement attached hereto as Exhibit B. In connection with the entry into each Covered Aircraft Sublease for a Covered Aircraft, United shall use commercially reasonable efforts to assign to Contractor the warranties of the aircraft and engine manufacturers available to United with respect to such Covered Aircraft. If United is unable to assign the foregoing warranties and is not otherwise able to provide for an agreement directly between Contractor and the applicable manufacturer providing for warranty coverage of such Covered Aircraft, then United shall act on behalf of Contractor in dealing with the applicable manufacturer to enable Contractor to obtain the benefit of such warranties as if United had been able to make such assignment. United further covenants and agrees not to accelerate the “Head Lease Expiration Date” as provided on Schedule 1 hereto with respect to any aircraft being operated by Contractor pursuant to this Agreement as of the time of determination without the prior written consent of Contractor if such acceleration would result in the Head Lease Expiration Date occurring prior to the end of the Term or the sublease expiration date for such Covered Aircraft as set forth in Schedule 1.

(b) Basic Rent payable under each Covered Aircraft Sublease shall be entirely abated unless and until (A) such Covered Aircraft has been withdrawn from this Agreement and no longer constitutes a Covered Aircraft, or (B) the occurrence of a Labor Strike, in which case such Basic Rent shall be payable until (x) such aircraft, and all other items required to be returned pursuant to such Covered Aircraft Sublease and this Agreement pertaining to such Covered Aircraft, shall have been returned to United in accordance with the terms of such Covered Aircraft Sublease and this Agreement, or (y) such Labor Strike shall have ended, as the case may be. In addition, in connection with the return of aircraft to United pursuant to Sections 2.08, 8.02(b)(x) or 8.02(c)(i), or in connection with the repossession of a Covered Aircraft by a lessor, lender or other financing party under a head lease for or mortgage of such aircraft (other than a repossession resulting from a breach of the Covered Aircraft Sublease by Contractor), Basic Rent shall continue to be entirely abated for the following period:

(i) for the return of aircraft pursuant to Section 8.02(b)(x), with respect to any such aircraft, (A) the duration (if any) of the grounding applicable to such aircraft (but only if such grounding is a complete grounding, as opposed to a grounding for passenger service only), plus (B) such period as is reasonably necessary for Contractor to return such aircraft in compliance with the provisions of the applicable Covered Aircraft Sublease, but in any event for not more than a period of four weeks after the later of the applicable Termination Date or the end of the Wind Down Period for such aircraft, if any, for the first *** such Covered Aircraft being returned, eight weeks after such date for the next *** such Covered Aircraft being returned, *** weeks after such date for the next *** such Covered Aircraft being returned, and *** weeks after such date for the remaining such Covered Aircraft being returned (such periods to run concurrently); and

27


(ii) for the return of aircraft pursuant to Sections 2.08 or 8.02(c)(i) or in connection with the repossession of a Covered Aircraft by a lessor, lender or other financing party under a head lease for or mortgage of such aircraft (other than a repossession resulting from a breach of the Covered Aircraft Sublease by Contractor), such period as is reasonably necessary for Contractor to return such aircraft in compliance with the provisions of the applicable Covered Aircraft Sublease, but in any event for not more than a period of *** weeks after the applicable Termination Date for the first *** such Covered Aircraft being returned, *** weeks after such date for the next such *** Covered Aircraft being returned, *** weeks after such date for the next such *** Covered Aircraft being returned, and *** weeks after such date for the remaining such Covered Aircraft being returned (such periods to run concurrently);

provided, that Basic Rent shall in each case cease to be abated with respect to any aircraft to be returned on the day following the day, if any, on which United waives any unsatisfied return conditions with respect to such aircraft. In addition, the provisions of Section 2.09 shall apply to the Covered Aircraft subject to a Covered Aircraft Sublease being returned to United.

(c) No periodic rent shall be payable under any Storage Sublease; provided that, with respect to any Deferred Obligations (as defined in the applicable Covered Aircraft Sublease), if Contractor (for all purposes of this proviso, as Sublessee in such Storage Aircraft Lease and the applicable Covered Aircraft Sublease) does not perform one or more of such Deferred Obligations, then United (for all purposes of this proviso, as Sublessor in such Storage Sublease and the applicable Covered Aircraft Sublease) shall be entitled to seek damages arising under this Agreement and/or the Covered Aircraft Sublease (but not under the Storage Sublease), including without limitation Basic Rent (but excluding Basic Rent for any period for which the Deferred Obligations have been deferred), against Contractor in an amount and type equivalent to the damages (arising under this Agreement and/or the Covered Aircraft Sublease) it would have been entitled to seek against Contractor had such obligations arisen under, and such non-performance occurred with respect to, the Covered Aircraft Sublease rather than the Storage Sublease.


(d) Neither Contractor nor any of Contractor’s Affiliates shall lease, sublease or otherwise obtain the use of any aircraft formerly subject to a Covered Aircraft Sublease for the six months following the termination of such sublease, unless Contractor has received prior written notice from United that United is not attempting to lease, sublease or otherwise obtain or retain the use of such aircraft (which notice, if true, shall be given by United upon Contractor’s request).


(e) Notwithstanding anything else contained herein to the contrary, if and when a Covered Aircraft Sublease terminates in accordance with its terms, then the aircraft subject to such sublease shall no longer constitute a Covered Aircraft effective on the date on which the term of such Covered Aircraft Sublease ends, regardless of whether the event giving rise to such sublease termination also constitutes an independent termination or withdrawal event hereunder. Any withdrawal occurring upon such a termination of a Covered Aircraft Sublease shall be separate and distinct from, and shall not limit or supersede, any other withdrawal rights of United contained in this Agreement.

Last edited by DirkDiggler; 05-01-2020 at 06:46 PM. Reason: formatting
Reply
Old 05-01-2020 | 06:45 PM
  #552  
Banned
 
Joined: Mar 2018
Posts: 1,358
Likes: 0
Default

Originally Posted by HighWingingIt
Didn’t UA have another Town Hall today?
It was pretty generic meaning no specific fleet plans, routes, etc. The main theme was that we are basically zero net revenue and at this point there has been no sign of recovery. We are bleeding bad, but not nearly as bad as others. When it comes to the recovery, they just don’t know. The initial forecast of revenue being down 30% this fall is now the optimistic view. The grant money bought some time. By late June, early July we should start to have an idea what October is going to look like. We are cutting to the bone for expenses. They can’t change the hourly rates, but they can reduce hours or positions to slow the cash burn. As a result many full time employees are having their hours reduced to part time and there will be a displacement bid for the pilots released tomorrow. There was no mention of what is in the bid. The rest was them talking about how serious they take this, that we’re family, that they know that lives are being affected by the decisions that they are making, but that they have to make them so that the company survives to provide good jobs when we pull through this.
Reply
Old 05-01-2020 | 07:29 PM
  #553  
DBono's Avatar
Gets Weekends Off
 
Joined: Sep 2017
Posts: 101
Likes: 0
From: Whole lotta sitting
Default

Originally Posted by Flydafe
Also reading the clause in the contract signed it deemed that this was the plan all along
Which contract are you referring to?
Reply
Old 05-01-2020 | 07:46 PM
  #554  
New Hire
 
Joined: Nov 2019
Posts: 1
Likes: 0
Default .

Originally Posted by Tilem
I would expect those 550’s to go to SkyWest. They’re basically 700’s. SkyWest has the crews, parts and sims to fly them. They will give up 200’s in exchange for them.

I don’t see GoJet weathering this storm. 33 airplanes is not enough to make this profitable.
I agree!! and i heard that they only have 30 that are configured what's your opinion on AW and C5 surviving
Reply
Old 05-01-2020 | 08:48 PM
  #555  
Gets Weekends Off
 
Joined: Jul 2019
Posts: 196
Likes: 0
Default

Originally Posted by Tilem
I would expect those 550’s to go to SkyWest. They’re basically 700’s. SkyWest has the crews, parts and sims to fly them. They will give up 200’s in exchange for them.

I don’t see GoJet weathering this storm. 33 airplanes is not enough to make this profitable.
GoJet is supposed to end up with 60 CRJ550s in the end. 26 of those are owned by SkyWest and will be leased to GoJet.
Reply
Old 05-02-2020 | 01:23 PM
  #556  
Gets Weekends Off
 
Joined: Apr 2020
Posts: 220
Likes: 0
Default

Originally Posted by Dixie320
GoJet is supposed to end up with 60 CRJ550s in the end. 26 of those are owned by SkyWest and will be leased to GoJet.
Also 20 Crj700 converted to 550s from Mesa starting in Sep, also being leased.
Reply
Old 05-03-2020 | 03:52 AM
  #557  
pangolin's Avatar
Gets Weekends Off
 
Joined: Jul 2017
Posts: 4,083
Likes: 0
From: CRJ9 CA
Default

Originally Posted by point80
Also 20 Crj700 converted to 550s from Mesa starting in Sep, also being leased.
Skywest and Mesa could just as easily keep them as 550s.
Reply
Old 05-03-2020 | 06:46 AM
  #558  
Line Holder
 
Joined: Oct 2019
Posts: 402
Likes: 0
From: Crew room attendant
Default

Originally Posted by point80
Also 20 Crj700 converted to 550s from Mesa starting in Sep, also being leased.

*Planned to arrive in September

Do you actually think any airline is spending money right now to remodel an interior of airplane? Those additional 550’s are being delayed.


Sent from my iPhone using Tapatalk
Reply
Old 05-03-2020 | 06:51 AM
  #559  
Gets Weekends Off
 
Joined: Apr 2020
Posts: 220
Likes: 0
Default

Originally Posted by pangolin
Skywest and Mesa could just as easily keep them as 550s.
This is true. And totally possible. But JO will probably make a killing leasing them to GoJet. He gets to update his fleet while making money on old planes

Last edited by point80; 05-03-2020 at 07:02 AM.
Reply
Old 05-03-2020 | 07:01 AM
  #560  
Gets Weekends Off
 
Joined: Apr 2020
Posts: 220
Likes: 0
Default

Originally Posted by StuckOnReserve
*Planned to arrive in September

Do you actually think any airline is spending money right now to remodel an interior of airplane? Those additional 550’s are being delayed.


Sent from my iPhone using Tapatalk
The 175s Mesa is getting were already delayed and the new date is Sep. They were suppose to come in May originally, but the factory in Brazil is closed. That’s the current situation, can it change, of course. Anything can change in this given climate. But, as of right now Ian, the guy in charge of the program, is still working on the shipment. What happens to the 700s is anyones guess.. Mesa can keep them, go to skywest, go to Gojet, be sold... Nobody knows but the last thing was they would go to GoJet.

Again, anything can change so its easy to speculate.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Chrismo01
Delta
17
11-08-2019 05:35 PM
Deez340
Regional
160
05-06-2008 09:41 PM
Nevets
ExpressJet
6
01-15-2008 04:21 AM
Nevets
ExpressJet
44
12-17-2007 09:37 AM
JoeyMeatballs
Regional
35
01-25-2007 04:26 AM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices