Mesa
#4103
Line Holder
Joined: Oct 2013
Posts: 1,674
Likes: 0
Actually EJET deliveries have been accelerated at the end of this year to 3 per month. They go back down to 2 per month most of next year except June when we take 3. This is based on the aircraft delivery schedule posted in the IAH crew room. Upgrades cannot happen any faster right now due to training resource limitations.
#4104
Line Holder
Joined: Dec 2013
Posts: 377
Likes: 0
From: men without hats
Actually EJET deliveries have been accelerated at the end of this year to 3 per month. They go back down to 2 per month most of next year except June when we take 3. This is based on the aircraft delivery schedule posted in the IAH crew room. Upgrades cannot happen any faster right now due to training resource limitations.
#4105
so just heard from JO that Hawaii is in the talks to open up again. Most likely to open by next year winter. Dont wait to long guys and gals!!
#4107
sippin' dat koolaid
Joined: Jun 2013
Posts: 982
Likes: 0
From: gear slinger
I heard that Mesa purchased all of the retired space shuttles and is opening a new domicile on the moon! Upgrade times will drop to six months with no relocation assistance and a 99 year seat lock.
#4108
Gets Weekends Off
Joined: Sep 2011
Posts: 352
Likes: 0
From: in a Big Box that moves back,forth, up, down and makes cool sounds
The moon domicile is true but Mesa is acquiring some Saturn Five rockets to get there. They will have to hire some street Captains to fly them(the type rating is too expensive).
ALPA is a already putting together some contract language.
J.O. wanted NASA folks to fly them but the scope language doesn't
allow it.
I think PSA is getting the Space Shuttles.
#4110
Line Holder
Joined: Jun 2014
Posts: 78
Likes: 0
You guys have it all wrong, Mesa is getting into the cruise ship business. Heard they are getting a port in Miami. I have a reliable source on the inside.
Thread
Thread Starter
Forum
Replies
Last Post



