Mesa 3.0
#6551
Gets Weekends Off
Joined APC: Apr 2016
Posts: 698
#6552
Gets Weekends Off
Joined APC: Jul 2008
Posts: 4,203
Another take would be they want to fan the flying out so it’s easier to cover a disruption during a draw down of flying.. there is some super complicated dealings going on behind the scenes. Mesa is out of contract for 4 days now. There was a big shakeup in UA Express leadership causing RFP delays.. advantage Mesa they have the old UAX President now.. disadvantage. They have Compass wanting in to undercut them..
#6553
Currently Furloughed
Joined APC: Mar 2014
Position: C172 Captain
Posts: 643
Another take would be they want to fan the flying out so it’s easier to cover a disruption during a draw down of flying.. there is some super complicated dealings going on behind the scenes. Mesa is out of contract for 4 days now. There was a big shakeup in UA Express leadership causing RFP delays.. advantage Mesa they have the old UAX President now.. disadvantage. They have Compass wanting in to undercut them..
#6554
Gets Weekends Off
Joined APC: Mar 2016
Position: DFW CRJ CA
Posts: 340
#6555
Line Holder
Joined APC: Apr 2013
Position: E175 Captain
Posts: 84
Nevertheless they keep sending E175 pilots to sit reserve in Dulles when we don’t even have a base there.
#6556
Gets Weekends Off
Joined APC: Mar 2016
Position: DFW CRJ CA
Posts: 340
Now that is a different discussion (and problem). But that also doesn't mean that a base is coming. 175's have been going to IAD for a couple of years now. Rumor of a base since day 1. Still no base.
#6557
Gets Weekends Off
Joined APC: Jul 2006
Posts: 737
Can somebody explain why some people say that it’s hard to open a E175 base in Dulles?
A Captain was explaining to me that, everyone in IAD would have to be given a chance to move equipments and that currently we don’t have the infrastructure to endure such endeavor. This captain also explained that there’s a loophole around it that implies 180 days of wait and taking off the 700’s out of Dulles temporarily... and there is when he lost me. I have the feeling that part has something to do with what’s happening with the 700’s and IAH
A Captain was explaining to me that, everyone in IAD would have to be given a chance to move equipments and that currently we don’t have the infrastructure to endure such endeavor. This captain also explained that there’s a loophole around it that implies 180 days of wait and taking off the 700’s out of Dulles temporarily... and there is when he lost me. I have the feeling that part has something to do with what’s happening with the 700’s and IAH
If things being the way they are right now....the 700s leave Dulles, if a new base forms there within 180 days, then the displaced pilots can bid back onto the new equipment there. After 180 days, displacement rights end.
#6558
Gets Weekends Off
Joined APC: Nov 2018
Posts: 832
I was sent there to sit short call reserve last week. Myself (Ejet FO), a CA and two FA’s. The CA told me that supposedly we have one or two Ejet as spares there. Any truth to that?
#6560
Gets Weekends Off
Joined APC: Dec 2013
Posts: 1,602
Thread
Thread Starter
Forum
Replies
Last Post