sandrich 11-06-2012 09:01 AM

We are behind on 8 Saab deliveries, apparently schedule "optimizing" software reduced the need for something like 15 crews, and MIA is not opening. Yea, I'd say we are very overstaffed and can see the reasoning behind a small scale furlough... At least for a month or two until we get those e170s people have been talking about :rolleyes:

rightside02 11-06-2012 10:41 AM

Heard it was 9 more saabs we are still waiting for, heard this in class just 8 days ago...

Guess the refurbishing is takin longer than expected.

Bassman1985 11-06-2012 12:57 PM


Originally Posted by rightside02 (Post 1288511)
Heard it was 9 more saabs we are still waiting for, heard this in class just 8 days ago...

Guess the refurbishing is takin longer than expected.

I've ferried 2 of them down from YQB to GNV for delivery. Both times we went up there and waited for 4-5 days before the plane was actually ready for us to bring down. First time I went up, there were two being prepped simultaneously, second one was ready the day after we left. Second time I went up there, the next one was sitting outside the hangar waiting for ours to depart so they had room to bring it in and work. Don't know if that one has been delivered yet, fleet number 358.

Fly782 11-06-2012 01:25 PM


Originally Posted by rightside02 (Post 1288081)
Why would they furlough only just cause they are two months behind on deliveries. ?? Doesn't seem cost effective

This coming from a former 9E pilot. The good ol it doesnt make sense or it is not cost effective. Did you already forget? ;)

Al Czervik 11-06-2012 01:40 PM


Originally Posted by Fly782 (Post 1288590)
This coming from a former 9E pilot. The good ol it doesnt make sense or it is not cost effective. Did you already forget? ;)

Soooooo true.

Av8tion 11-06-2012 02:38 PM

If you guys are still getting the ones from Colgan... I did a leaseback test flight earlier this year and had to do an air return due to an avionics failure.... have fun ;)

jsfBoat 11-06-2012 02:56 PM


Originally Posted by Av8tion (Post 1288621)
If you guys are still getting the ones from Colgan... I did a leaseback test flight earlier this year and had to do an air return due to an avionics failure.... have fun ;)

Our Saabs were Red and Gray in their former lives.

rightside02 11-06-2012 03:09 PM



Originally Posted by rightside02 (Post 1288081)
Why would they furlough only just cause they are two months behind on deliveries. ?? Doesn't seem cost effective

This coming from a former 9E pilot. The good ol it doesnt make sense or it is not cost effective. Did you already forget? ;)
Guess I have been brain washed

PatrickBateman 11-07-2012 07:23 AM

We really need to lose this mickey-mouse out station basing crap.

rightside02 11-07-2012 08:33 AM


We really need to lose this mickey-mouse out station basing crap.
The truest statement I have heard in a hot minute