Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Other (https://www.airlinepilotforums.com/other/)
-   -   Silver Airways (https://www.airlinepilotforums.com/other/64199-silver-airways.html)

CaptainCarl 02-10-2014 04:36 PM


Originally Posted by ctab5060X (Post 1578570)
I agree, MM is part of the problem. Let's face it, bid packs are delayed again for 2 days. Unacceptable.

That was my doing. I've been working on the Beech lines for eight hours straight. My input, should it be approved, will greatly increase the efficiency of my CLE guys/gals while simultaneously improving QOL (specifically, days off and commutability).

http://blog.amandacollins.me/wp-cont...-the-world.jpg

:cool:

Salukipilot4590 02-10-2014 04:38 PM


Originally Posted by CaptainCarl (Post 1578580)
That was my doing. I've been working on the Beech lines for eight hours straight. My input, should it be approved, will greatly increase the efficiency of my CLE guys/gals while simultaneously improving QOL (specifically, days off and commutability).

http://blog.amandacollins.me/wp-cont...-the-world.jpg

:cool:

<3 U boo boo!

ctab5060X 02-10-2014 04:39 PM


Originally Posted by CaptainCarl (Post 1578580)
That was my doing. I've been working on the Beech lines for eight hours straight. My input, should it be approved, will greatly increase the efficiency of my CLE guys/gals while simultaneously improving QOL (specifically, days off and commutability).



:cool:

Carl:

Not your fault! They should have had the lines out to the union in enough time for y'all to review and submit changes.

That, and they should create lines that don't need 8 hours of work on them after they are made.

dmncnpilot 02-10-2014 04:39 PM


Originally Posted by ctab5060X (Post 1578573)
Not if your LCR language was even remotely solid. They would have to be very, very proactive to keep you out for 18 days and you would at least have some notice of what you are doing rather than the typical "OMG, how soon can you be at the airport?!?".

If they really wanted to keep current pilots, attract new pilots, and make the reserve system super effective, then they need to keep the current rules in place (all of them) and create additional rules for Long call, short call, and unfortunately, airport standby reserve.

The answer to their omg, how fast can you make it to the airport? Question should always be; yes Rrrrrrrbn I'll be there ASAP, in an hour and thirty minutes, then smile :D

I see what you're saying, but not for nothing, MM can't even stagger the RSV lines correctly, what makes you think she can keep up with different types of RSVs?

dmncnpilot 02-10-2014 04:41 PM


Originally Posted by Salukipilot4590 (Post 1578576)
Hey brotha just trying to be nice haha

I know bro, we play for the same sorry team :)

ctab5060X 02-10-2014 04:43 PM


Originally Posted by dmncnpilot (Post 1578583)
The answer to their omg, how fast can you make it to the airport? Question should always be; yes Rrrrrrrbn I'll be there ASAP, in an hour and thirty minutes, then smile :D

Very true, but it doesn't keep the ever revolving and new crew schedulers from asking.


Originally Posted by dmncnpilot (Post 1578583)
I see what you're saying, but not for nothing, MM can't even stagger the RSV lines correctly, what makes you think she can keep up with different types of RSVs?

Somehow I get the feeling that with this 18 day off requirement, we are going to end up with days where we have no reserves scheduled and others where every reserve is scheduled for 4am to 4pm.

We need (now) different reserve availability periods, and if the company is going to insist on building standup lines, we need reserves specifically designated to cover those if need be.

Salukipilot4590 02-10-2014 04:44 PM


Originally Posted by dmncnpilot (Post 1578585)
I know bro, we play for the same sorry team :)

The Detroit Lions?

dmncnpilot 02-10-2014 05:12 PM


Originally Posted by Salukipilot4590 (Post 1578588)
The Detroit Lions?

I was thinking NY Mets...

CaptainCarl 02-10-2014 05:17 PM


Originally Posted by ctab5060X (Post 1578582)
Carl:

Not your fault! They should have had the lines out to the union in enough time for y'all to review and submit changes.

That, and they should create lines that don't need 8 hours of work on them after they are made.


Originally Posted by ctab5060X (Post 1578587)
Somehow I get the feeling that with this 18 day off requirement, we are going to end up with days where we have no reserves scheduled and others where every reserve is scheduled for 4am to 4pm.

We need (now) different reserve availability periods, and if the company is going to insist on building standup lines, we need reserves specifically designated to cover those if need be.

I need a Scheduling rep for each domicile. If you want it, you got it... until you're dead or I find someone better.

Cruz5350 02-10-2014 06:07 PM


Originally Posted by CaptainCarl (Post 1578611)
I need a Scheduling rep for each domicile. If you want it, you got it... until you're dead or I find someone better.

Now I didn't spend 8 hrs but when I was the MEI rep I saw decent lines one month. I told MM the guys would like that and the only thing everyone would like to see was commutability on one end of a pairing if not both. Then the lines came out..... Way worse than anything we had seen for the base ever.


All times are GMT -8. The time now is 10:28 AM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands