![]() |
Originally Posted by JayBee
(Post 2183719)
out of morbid curiosity, since it looks like it would be easy to get MSP
how hard would it be to get COS ? reserve time ? etc ? thanks |
Thanks. I'm looking to live in base, spent a little time in COS while in the Air Force and I like the area. I guess you get to pick 5 bases while in training so I was just thinking where else I wouldn't mind.
Any suggestions for short reserve and decent place to live ? I'll probably end up with MSP at the top of my list but might as well consider other bases. |
Originally Posted by Mercyful Fate
(Post 2183659)
News flash....you are either going to be a "regional lifer" or a move on to a career as a Walmart greeter.
|
Originally Posted by JB22
(Post 2183939)
A Walmart greet would be a much better outcome in the long run than being a lifer at a commuter flying 19 days a month.
Aren't PBS bids supposed to be out? |
Originally Posted by MrSkywest
(Post 2184018)
I really don't see the difference.
Aren't PBS bids supposed to be out? |
How long is Skywest Technical Portion Interview ?
What does the typical interview process entail ? 30 Min Intro 45 Min Technical 45 Min HR 30 Min Lunch ? What materials, books are recommended to prepare? |
Past experience shows that the longer they take to come out, the worse the bids are. Yes they have until tomorrow at 9:00 mecca time, but the last couple months they have been out by the morning of the 19th.
Good luck to everyone. It wouldn't seem as nefarious if we had bid transparency. I'm sure that is just around the corner. |
How long to hold SFO or LAX as f/o on CRJ or ERJ?
|
It must be a Christmas miracle cause my bid turned out great and it was by far the most complicated I've ever had!
|
Does anyone commute from TPA to DTW? I have an offer from Skywest and I live ten minutes from TPA.
I'm curious about Express Jet because of ATL. Any info would be great. Thanks. |
| All times are GMT -8. The time now is 08:42 PM. |
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands