Skywest v2.0
#5863
#5864
Newbie
Joined: Jan 2017
Posts: 125
Likes: 0
I haven't heard there is a shortage of Ejet FO's. If that was the case, why a longer wait on reserve? Are you saying the longer FO reserve is because of a Ejet captain slowdown?
#5865
Gets Weekends Off
Joined: Jul 2013
Posts: 1,544
Likes: 0
From: 175 CA
Couldn't that also be because the deliveries of ERJ's are coming to an end this summer (if they don't decide to get another 100 Ejets)?
I haven't heard there is a shortage of Ejet FO's. If that was the case, why a longer wait on reserve? Are you saying the longer FO reserve is because of a Ejet captain slowdown?
I haven't heard there is a shortage of Ejet FO's. If that was the case, why a longer wait on reserve? Are you saying the longer FO reserve is because of a Ejet captain slowdown?
#5867
Prime Minister/Moderator

Joined: Jan 2006
Posts: 44,895
Likes: 690
From: Engines Turn or People Swim
A recent 121 failure would almost certainly need to go build some more time and maybe do 135 before getting hired at SKW. I suppose anything's possible these days, but they have not made a habit of scooping up rejects from other regionals.
That said, the training program is more thorough and less arbitrary than some other places, so some folks will do better here with the structure than at other places. At some places it can come down to luck...if your sim partner sucks, you're hosed.
#5869
On Reserve
Joined: Oct 2012
Posts: 199
Likes: 7
From: Right Side Up
At the schoolhouse right now, our instructor said there were 5 failures alone last week. Mostly for bone-headed mistakes is what it sounds like, not for the FAA is trying to find nit-picky things to fail people on (although they have been observing more and more LOEs).
#5870
Line Holder
Joined: May 2016
Posts: 44
Likes: 0
Heard 4 crews pinked the LOE within the last few days. This is the first AQP initial group.
Thread
Thread Starter
Forum
Replies
Last Post



