Originally Posted by acl65pilot (Post 1468573)
Great idea, but lets look back to when all of this was done. They AF JV was done well before the economic collapse in Europe, and before the financial meltdown here. The common sense guidance was that Europe was relatively stable for us and growth would come to our side on a 2/3rds ratio. It hasn't and we have seen what a contracting environment does when you are to get 2/3rds of the block hrs or half of the EASK's.

Doesn't negate the fact that our side agreed to a PWA that allows the company to get away with non-compliance for too long because technically they're not in non-compliance until the period ends (even though calculations show they won't be in compliance). The fact that our MEC is already addressing this (and is at the disadvantage of having a scope section on the issue without some teeth in it) is admittance to how the portion of the PWA was inadequately written.


Originally Posted by acl65pilot (Post 1468573)
Do you think that the company likes that a Reserve pilot can get pay no credit above guarantee and get their off days back when on reserve? Do you think they are happy that we can drop to zero hours in a month? Do you think they are happy that any DAL pilot can leave at any time they choose and they don't have a way to meter us out the door? Do you think they are happy with NO OE recovery for FO's now and they got a 12 month lock for new hires?

Do you think the company was surprised about these issues AFTER they signed? No, they knew these were areas where they'd prefer to have gotten more of what they wanted, but didn't. Now that is what occurs on both sides. What we're discussing is how our union has been caught flat footed for failing to realize what the company realized it could get away with because there weren't immediate penalties written into the PWA for non-compliance; moreover, we have to wait more than three years for it to technically be a non-compliance. The fact that the MEC is voicing their displeasure now is evidence of how the NC failed to think ahead to put in language to better ensure compliance (not after 3 years) and with specific costs for not doing so.


Originally Posted by acl65pilot (Post 1468573)
IMO, we are at a place in time where our company is making great profits, margins are steadily increasing, and they are still ahead of their competitors by a good bit. I would say we as a group have desired to get to this point. It where there is money available for our next round.

That's what we thought the last time around, isn't it? Yet, we were told we got all we could. Then, voila, a billion is there for dividends. I'm not saying the company exits to give the pilot group all that, but I don't want to hear from some how there wasn't anything more we could have gotten. Changeover of 50% of the MEC or not, I don't have much confidence things will be different next time around until I hear some mea culpas on how C2012 was more concessionary than it had to be.

badflaps 08-23-2013 11:01 AM

Hah! Fifi's not so great, five hour maint. delay CVG/TPA right now, I think a fizzle nut fell off the frog grater....

johnso29 08-23-2013 11:09 AM


Originally Posted by badflaps (Post 1468641)
Hah! Fifi's not so great, five hour maint. delay CVG/TPA right now, I think a fizzle nut fell off the frog grater....

Being in CVG doesn't help. It seems like they aren't really stocking parts anywhere right now. I was in ATL a few weeks ago, & they didn't have a Stand by power switch for a B757! Delta's love child fleet! And we were in ATL! I couldn't believe it.

acl65pilot 08-23-2013 11:15 AM


Originally Posted by GunshipGuy (Post 1468639)
Doesn't negate the fact that our side agreed to a PWA that allows the company to get away with non-compliance for too long because technically they're not in non-compliance until the period ends (even though calculations show they won't be in compliance). The fact that our MEC is already addressing this (and is at the disadvantage of having a scope section on the issue without some teeth in it) is admittance to how the portion of the PWA was inadequately written.

When AZ was brought it our goal was to stay at 50% of the EASK's. We would have been well below it if we would have just added AZ EASK's to the total mix and then take our look-back percentage. Prior to the addition of AZ our negotiated portion was over 51%. It would have been near 47% without negotiations.

What we got with AZ being added and the start of a new three year measurement period was 50-50 on the EASK's. At the time the industry was moderately growing, DAL was still eying to be A 50-50 International airline etc. We also forget that we were the first with these types of JV's and most have literally copied our language.

Yes three years is too long, yes it should be shorter, yes, DAL would be in violation of the PWA is the end of the cure period was today, and yes the MEC is watching it. Like it or hate it a MEC about two and a half years ago agreed to this. Remember that we were just starting to have profitable years back then? Remember the environment we were in? Those that drafted this language go what they could. I asked, and asked and asked. Honestly I believe em. I also believe the Reps when they say that they are watching this very closely because it means WB jobs and seat progression to all. After all it was negotiated in good faith, but it was negotiated.


Do you think the company was surprised about these issues AFTER they signed? No, they knew these were areas where they'd prefer to have gotten more of what they wanted, but didn't. Now that is what occurs on both sides. What we're discussing is how our union has been caught flat footed for failing to realize what the company realized it could get away with because there weren't immediate penalties written into the PWA for non-compliance; moreover, we have to wait more than three years for it to technically be a non-compliance. The fact that the MEC is voicing their displeasure now is evidence of how the NC failed to think ahead to put in language to better ensure compliance (not after 3 years) and with specific costs for not doing so.
I disagree. Flat footed no, it has been trending this way for a year and a half. Remember back in Bush's last six months in office how the world was caught off guard about the enormity of the financial mess? Remember how Europe fell next? Remember how Asia was doing well and they moved WB flying over there? We have to realize where we were at the time, and to say that the this was all known prior to agreeing to this language is in my opinion incorrect.

We don't have to like what we agreed to, we can accuse DALPA of being duped, or we can see where the language has not met our goals and if there is non-compliance in March of 2015 we remedy it. If there is an opportunity prior to that I am sure the MEC will look at it.


That's what we thought the last time around, isn't it? Yet, we were told we got all we could. Then, voila, a billion is there for dividends. I'm not saying the company exits to give the pilot group all that, but I don't want to hear from some how there wasn't anything more we could have gotten. Changeover of 50% of the MEC or not, I don't have much confidence things will be different next time around until I hear some mea culpas on how C2012 was more concessionary than it had to be.
I was vocal about the TA, but honestly, its over a year in the rearview mirror. The MEC is different, more vocal, and seeking the changes and gains the pilots want. The company is doing very well, and if anything it just raises my expectations farther. I do not think that those that voted for the TA liked the work rule changes, but many weighed it for what it was and voted for it. We can be irritated with that fact, or we can reengage and make sure that the next time we are in that level of negotiations it adds more than a billion dollars over three years. I know what I want done.

I am sure that the next round of "all in" negotiations will prove the the viability of proactive engagement.

GunshipGuy 08-23-2013 11:29 AM


Originally Posted by johnso29 (Post 1468521)
There are now parameters that have to be met. There have been very few Good Faith calls, & DALPA is very aware of them. After talking with my Rep for over 1 hour, I'm confident that DALPA is engaging the company on the details of the new sick policy.


Originally Posted by GunshipGuy (Post 1468553)
What are those parameters? My reading of the PWA allows for the company to call "when individual circumstances exist." As far as I can tell that's undefined, so the CPO can call for verification when he chooses as long as they've been given a "good faith basis." Again, no parameters stated in the PWA.


Originally Posted by johnso29 (Post 1468578)
Incorrect. The parameters are absences exceeding 15 days or if over 100 hours has been used. As I said, as of last week only 31 Good Faith calls had been made. And from the conversation I've had with several reps from different bases, the union is not lying down on this. There pushing back on those calls as it is.

You're correct in that section 14 F.3 has parameters before verification is required, but that's not the whole story. You should realize 14 F.4 (below) is separate from F.3 and does not require a pilot to reach those numbers before the CP makes his inquiry.
4 4. When individual circumstances exist that give the Company a good faith basis to inquire
5 regarding the medical reason for a pilot’s use of sick leave, such pilot may be required to
6 state the nature of his illness in general terms to his Chief Pilot. Following such
7 discussion, the Chief Pilot may:
8 a. consider the current sick leave occurrence to be verified, or
9 b. require verification of sickness from the pilot under Section 14 F. 2.
10 Note: Such individual circumstances may not be derived solely from the amount of sick
11 leave used by the pilot or the frequency of his sick occurrences.

I don't see any parameters there, and to me it seems the CP is well within his right to call and inquire as to why a pilot called in sick. And then if the CP wanted the pilot to back it up with a doctors visit he could.

My background and experience was you flew unless you were sick. If you were sick then you went to see a doctor and he documented the event. I'm not bemoaning the language, but I do read it as giving the CP a lot of latitude to verify sick usage. The language in the old PWA pretty much gave them the same right.

GunshipGuy 08-23-2013 11:43 AM


Originally Posted by acl65pilot (Post 1468652)

I was vocal about the TA, but honestly, its over a year in the rearview mirror. The MEC is different, more vocal, and seeking the changes and gains the pilots want. The company is doing very well, and if anything it just raises my expectations farther. I do not think that those that voted for the TA liked the work rule changes, but many weighed it for what it was and voted for it. We can be irritated with that fact, or we can reengage and make sure that the next time we are in that level of negotiations it adds more than a billion dollars over three years. I know what I want done.

I am sure that the next round of "all in" negotiations will prove the the viability of proactive engagement.

ACL, good points and added info. I'm hoping next time will be better as well. I think a good start would be a survey that doesn't include any "what would you be willing to give up for..." I can't recall if that was specifically in the survey, but I was left with a sense that was the tone in some parts.

PilotFrog 08-23-2013 12:05 PM

Yep, that is how I'm gonna use mine
 
http://www.blogcdn.com/www.engadget....d-ereaders.jpg

johnso29 08-23-2013 12:09 PM


Originally Posted by GunshipGuy (Post 1468658)
You're correct in that section 14 F.3 has parameters before verification is required, but that's not the whole story. You should realize 14 F.4 (below) is separate from F.3 and does not require a pilot to reach those numbers before the CP makes his inquiry.
4 4. When individual circumstances exist that give the Company a good faith basis to inquire
5 regarding the medical reason for a pilot’s use of sick leave, such pilot may be required to
6 state the nature of his illness in general terms to his Chief Pilot. Following such
7 discussion, the Chief Pilot may:
8 a. consider the current sick leave occurrence to be verified, or
9 b. require verification of sickness from the pilot under Section 14 F. 2.
10 Note: Such individual circumstances may not be derived solely from the amount of sick
11 leave used by the pilot or the frequency of his sick occurrences.

I don't see any parameters there, and to me it seems the CP is well within his right to call and inquire as to why a pilot called in sick. And then if the CP wanted the pilot to back it up with a doctors visit he could.

My background and experience was you flew unless you were sick. If you were sick then you went to see a doctor and he documented the event. I'm not bemoaning the language, but I do read it as giving the CP a lot of latitude to verify sick usage. The language in the old PWA pretty much gave them the same right.

I'm familiar with the entire policy, & I understand your point. So if the old agreement gave the CP the same rights, wouldn't you consider 100 hours of unverified time per year a gain?

My point has been that the new sick policy is better then the old one.

80ktsClamp 08-23-2013 12:14 PM


Originally Posted by badflaps (Post 1468641)
Hah! Fifi's not so great, five hour maint. delay CVG/TPA right now, I think a fizzle nut fell off the frog grater....

Just give it a glass of wine and some cheese, wait until she is le ready.

80ktsClamp 08-23-2013 12:15 PM


Originally Posted by johnso29 (Post 1468647)
Being in CVG doesn't help. It seems like they aren't really stocking parts anywhere right now. I was in ATL a few weeks ago, & they didn't have a Stand by power switch for a B757! Delta's love child fleet! And we were in ATL! I couldn't believe it.

The part was in CVG, amirite??