Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   Delta (https://www.airlinepilotforums.com/delta/)
-   -   Any "Latest & Greatest" about Delta? (https://www.airlinepilotforums.com/delta/36912-any-latest-greatest-about-delta.html)

scambo1 04-28-2014 06:42 AM


Originally Posted by dalad (Post 1631700)
Alan, we already have that in the preferences. I never put in for a one day GS.

I don't do GSs unless they are 6+ hrs/day. Why would we want to monkey with the system we have?

RockyBoy 04-28-2014 06:46 AM


Originally Posted by RonRicco (Post 1631748)
I agree. GS preferences are just like WS preferences. If you don't want to work one day GS, or a 4 day GS, you can avoid them easily.

I get that and that is what a lot of us do, but follow me on this for a second.

Say you want to try and make some extra $$$ for the month. You put in a GS for a 2 or 3 day trip. The guy 1 number senior to you gets a 4 day GS worth 22:00. A few hours later you get a 2 day that pays 10:30.

The next week you still feel like working for a little more $$$ so you put in the same preference for a 2 or 3 day GS. Up pops a nice 17:00 3-day and it goes to the guy one number senior to you on his 2nd GS. An hour later another 10:30 2 days shows up and it's yours.

At the end of the month you both did 2 GS's. The guy right above you has 39 hours of GS pay and you have 21. If we had a system that assigned them based on GS hours instead of the actual number of GS's you would have ended up with 27:30 and he would have ended up with 32:30. You would have gotten the 3 day he would have gotten the 2 day.

I know there are a lot more variables that come into play, it just evens out the amount of hours and takes the luck of the crappy trip showing up for any given person out of the equation. If you take the crappy one, you will get another one before the lucky guy who gets the goldmine.

Purple Drank 04-28-2014 07:11 AM


Originally Posted by tsquare (Post 1631625)
Problem is though, that his time in the box has not changed. He was on reserve 17 days/month then, and is on call 17 days/month now. The inconvenient fact is that he is now being used on more of those 17 days. That he became accustomed to sitting in his jammies all that time is irrelevant

That's one side of the story. Here's the other:

Concessions in C12 enable the higher utilization you're referring to. A partial list:

- summer bid periods form 31 to 30 days--major concession
- must fly more until full (up to ALV+15) (granted, this concession was partially offset by a higher guarantee)
- up to 7 short calls (a giveback after just negotiating for 6)

The company can now man for lean months and flex for heavy months...thanks to concessions in C12.

orvil 04-28-2014 07:27 AM


Originally Posted by Purple Drank (Post 1631771)
That's one side of the story. Here's the other:

Concessions in C12 enable the higher utilization you're referring to. A partial list:

- summer bid periods form 31 to 30 days--major concession
- must fly more until full (up to ALV+15) (granted, this concession was partially offset by a higher guarantee)
- up to 7 short calls (a giveback after just negotiating for 6)

The company can now man for lean months and flex for heavy months...thanks to concessions in C12.

The change in bid period length was a major concession. You don't notice it until you try to put your bids in and try to maximize your time off. It's a big deal.

Bucking Bar 04-28-2014 07:27 AM

Outsourcing costs more?
 

Originally Posted by Michael Boyd
Airline Labor Costs: A Whole Lot More Than Hourly Rates

Last month, the president of Boyd Group International was honored to have been invited to provide an outline and discussion of emerging airline industry trends to the board of directors at Southwest Airlines.

Naturally, among the many areas covered was the issue of labor costs. Southwest - to its credit - has some of the highest-paid employees in the industry. This leads some of the veneer analysts in the financial world to conclude that the airline has a prima face labor cost disadvantage. At the discussion with the board, the following "industry heresy" was put on the table. Heresy, because it runs counter to "what everybody knows," which tends to threaten the status-quo thinking.

Fact: Labor Rates Do Not Concretely Equate To Labor Costs. It's easy to compare hourly wage rates for most airline classes and crafts. It's less easy, but possible to compare the costs of various labor structures at airlines. And any high school kid or media reporter can pull down BTS data and make a fool of himself by assuming the cost comparisons between airlines are valid.

True airline "labor costs" are the expense of getting the job done. It is not whether the airline-employed ramp agent is paid $25 an hour, or whether it's farmed out to subcontractor with staff being paid $15 an hour. It's the total cost of getting, say, the bag from the check-in counter, to planeside, onto the aircraft, off at the passenger's destination, and delivered to the claim area. Successfully. Efficiently. On-Time. Without tire tracks across the front of the Samsonite.

Outsourcing May Be The Only Path, But... To many of the financial analyst types, some of whom wouldn't know a bag tag from a Starbucks receipt, the dollars spent on raw labor and benefits are the only costs to consider. But in the airline industry, how the job is done, and - critically - the quality and efficiency of the work - is the true cost. Unfortunately, standard accounting practice doesn't give any mechanisms to track the total comparative costs of in-house labor v outsourcing.

To be sure, outsourcing may be less expensive when all is considered - that is true. But as it stands today, there are virtually no systemic mechanisms in airline accounting to fully encompass all of the metrics involved. For a simple example: the difference between treating passengers as customers, as opposed just processing them. (Not that this isn't a situation that takes place daily where there is no outsourcing, but it's a lot more likely when the person dealing with the passenger has no skin in the game, career-wise.)

At the baseline, it can be (generally) assumed that an airline employee (if professionally treated and directed) will at least have the opportunity to have more incentive and pride in her work compared to a low-paid contract worker who knows that this career path will last only until the contract is re-bid in a year or two.

It's not always the case, but regardless of protestations from the budget department to the contrary, that factor alone - having no future at the airline - has some additional costs built into the outsourced $15 wage rate. One is the natural tendency not to go the extra mile in doing the job - because the outsource system provides no incentive to do so. Another is the fact that some of the outsourced staff are there only until something better opens up. So, regardless of the work ethic of the outsourced employee (which could be excellent) there is no career in the job - and that has consequences.

It's Not Sophisticated Or Difficult Work, Right? Another argument for outsourcing is that many of these jobs are, well, menial. Like, what does it take to load a bag? Answer: a lot. Running a ramp operation is not like a chain gang. Staff are working on time-certain deadlines. They are working within a coordinated set of movements of airplanes, passengers, baggage and cargo. They are working around and operating ground equipment - tugs, belt loaders, baggage carts, etc. (a.k.a. "aircraft-seeking devices" to those of us who have managed ramp operations.) They are not shoveling coal into a furnace: they are loading the property of customers onto and off of multi-million dollar airplanes.

One Late Departure And Poof! Go The Labor Savings. The A4A just estimated that a delay costs an airline $78 a minute. A couple of minutes can really eat into that great saving of farming out the ramp work. Anybody who's managed an airport ramp can today probably see lots of "$78s" going out the door from time to time at almost any outsourced hub ramp.

Lots of Opportunities For Running Up The Real Labor Tab. Give it a thought: what's the cost of just one bag not loaded on the right airplane? What is the cost of not having the right bag removed at an intermediate point on the aircraft routing? What's the cost of handling passengers who missed their connection because the RJ arrived late, and the outsourced ramp staff either had no idea, or no incentive to hustle off the "carry on" from the rear bin? What's the cost of a ticked-off business traveler facing a creeping three-hour departure delay, when none - none - of the outsourced "customer service" staff have any idea why the flight isn't leaving on time? (Not a hypothetical, by the way.)

Not that these events are by nature inevitable to the practice of outsourcing. But, logically, they are more likely than on a ramp operated by motivated (and that's sometimes problematic) team of airline employees. Therefore, the true savings of outsourcing key tasks are not fully identified.

Necessary, But Not Always As Cost-Effective As It's Cracked Up To Be. Let's face it. Increased outsourcing is a now a key - and probably in many cases, necessary - part of the operation of airlines in the US. In the EU and Asia, it's been SOP for decades. It is also a reality that in many cases wage rates and work rules have skyrocketed the cost of airline operations, leading to the option of just farming out as much as possible.

But there is a set of costs that in some cases may well make the practice a lot less economical than the $10 per hour (or whatever) difference cost-effective.

Quality has a cost.

Emphasis mine.

Where's Slowplay? Lets sharpen our pencils.

TeddyKGB 04-28-2014 07:44 AM


Originally Posted by Bucking Bar (Post 1631558)
But it does not sound like we will have the pilots either ....

How does Virgin America and Norwegian find FO's?

Plenty of sellouts like shyguy who are willing to undercut the industry and Ho themselves out. :D

CheapTrick 04-28-2014 07:58 AM


Originally Posted by RockyBoy (Post 1631759)
I get that and that is what a lot of us do, but follow me on this for a second.

Say you want to try and make some extra $$$ for the month. You put in a GS for a 2 or 3 day trip. The guy 1 number senior to you gets a 4 day GS worth 22:00. A few hours later you get a 2 day that pays 10:30.

The next week you still feel like working for a little more $$$ so you put in the same preference for a 2 or 3 day GS. Up pops a nice 17:00 3-day and it goes to the guy one number senior to you on his 2nd GS. An hour later another 10:30 2 days shows up and it's yours.

At the end of the month you both did 2 GS's. The guy right above you has 39 hours of GS pay and you have 21. If we had a system that assigned them based on GS hours instead of the actual number of GS's you would have ended up with 27:30 and he would have ended up with 32:30. You would have gotten the 3 day he would have gotten the 2 day.

I know there are a lot more variables that come into play, it just evens out the amount of hours and takes the luck of the crappy trip showing up for any given person out of the equation. If you take the crappy one, you will get another one before the lucky guy who gets the goldmine.

Actually, it just dilutes seniority.

Herkflyr 04-28-2014 08:09 AM


Originally Posted by RockyBoy (Post 1631759)
I get that and that is what a lot of us do, but follow me on this for a second.

Say you want to try and make some extra $$$ for the month. You put in a GS for a 2 or 3 day trip. The guy 1 number senior to you gets a 4 day GS worth 22:00. A few hours later you get a 2 day that pays 10:30.

The next week you still feel like working for a little more $$$ so you put in the same preference for a 2 or 3 day GS. Up pops a nice 17:00 3-day and it goes to the guy one number senior to you on his 2nd GS. An hour later another 10:30 2 days shows up and it's yours.

At the end of the month you both did 2 GS's. The guy right above you has 39 hours of GS pay and you have 21. If we had a system that assigned them based on GS hours instead of the actual number of GS's you would have ended up with 27:30 and he would have ended up with 32:30. You would have gotten the 3 day he would have gotten the 2 day.

I know there are a lot more variables that come into play, it just evens out the amount of hours and takes the luck of the crappy trip showing up for any given person out of the equation. If you take the crappy one, you will get another one before the lucky guy who gets the goldmine.

I tend to agree with your logic; however over the long haul I think these examples would tend to even out. This month you didn't get the lucky GS award, but six months later you might, and the guy who got lucky this month instead of you will instead be the guy who got a one-day, while the very next day you got the high-time 3-day.

The bottom line is that our negotiators have a finite number of issues to deal with and associated negotiating capital. Unless your reps get a lot of particular feedback on this issue, it probably isn't worth changing a system that most guys tend to be happy with.

tsquare 04-28-2014 08:18 AM


Originally Posted by Purple Drank (Post 1631771)
That's one side of the story. Here's the other:

Concessions in C12 enable the higher utilization you're referring to. A partial list:

- summer bid periods form 31 to 30 days--major concession
- must fly more until full (up to ALV+15) (granted, this concession was partially offset by a higher guarantee)
- up to 7 short calls (a giveback after just negotiating for 6)

The company can now man for lean months and flex for heavy months...thanks to concessions in C12.

I'll give you the summer bid period thingy. You are right on that. I still stand by my observation about the rest though. You are actually having to work for your pay instead of sitting home clipping coupons and that frustrates you. There are many reserves that get a monthly "line" worth more than a regular line holder, that has to work for every minute of pay. If you want sympathy for actually having to operate an airplane for a paycheck, I think you are in the wrong place. Why don't you learn the contract and take advantage of that flex capability. I certainly do, and it isn't hard.

And while we are at it, how many ALV +15 months have you flown so far?

Alan Shore 04-28-2014 08:54 AM


Originally Posted by Purple Drank (Post 1631771)
Concessions in C12 enable the higher utilization you're referring to.

I agree that we are more productive under C2012 to the tune of 1-2 fewer pilots required per category, due to the 30-day summer bid periods and the wider ALV swing. That said:


Originally Posted by Purple Drank (Post 1631771)
- summer bid periods form 31 to 30 days--major concession

Certainly the biggest one. It gives each pilot two fewer days off in the summer months.


Originally Posted by Purple Drank (Post 1631771)
- must fly more until full (up to ALV+15) (granted, this concession was partially offset by a higher guarantee)

To be more accurate, he may be assigned more flying until he is full. The point at which a reserve pilot is full, however, did not go up. Rather, it is now lower in a month in which he has a known absence such as CQ training, vacation, etc.


Originally Posted by Purple Drank (Post 1631771)
- up to 7 short calls (a giveback after just negotiating for 6)

Again, in return for the higher guarantee. FWIW, we had six short calls at Delta since 2001.


Originally Posted by Purple Drank (Post 1631771)
The company can now man for lean months and flex for heavy months.

Not quite. They do not have to be quite so overstaffed in the lean months as before, but they still must carry some extra. The silver lining in that is that a pilot who is on the bubble of being able to hold a regular line will often now be able to do so, rather than being forced to reserve each winter.


All times are GMT -8. The time now is 01:37 PM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands