Any "Latest & Greatest" about Delta?
If you, Carl, Ferd, FTB, and all others who make my airport standby a little bit easier are leaving, please let the rest of us that lurk know.
Thank you,
The Chow
I have a rotation with both a front end and back end deadhead. I want to deviate on both. I think that I figured out the front end OK, booked company business, and will inform crew scheds. Is it the same on the back end? I seem to remember it being different somehow?
Regular lineholder if it matters...
Regular lineholder if it matters...
Can't abide NAI
Joined APC: Jun 2007
Position: Douglas Aerospace post production Flight Test & Work Around Engineering bulletin dissembler
Posts: 11,990
LGA $3.6B terminal expansion... for the other airlines.
Evidently, according to this picture, we'll run into the buildings when using the taxiways.
La Guardia Terminal Update Sought - WSJ.com
But I have a better idea. Call it the Scambo idea.
First, we bulldoze all but the main terminal building, no more arms/legs/extensions and jetways. Now let the airlines fight for the few gates that are left.
Then bulldoze everything on the south side of Grand Central Parkway to Astoria Blvd. We can use that to build a grand terminal and parking area. Sadly for RJs, but just maybe one day mainline jets!!!!!!
Then build a walkway from our terminal in LGA to our terminal in JFK.
Evidently, according to this picture, we'll run into the buildings when using the taxiways.
La Guardia Terminal Update Sought - WSJ.com
But I have a better idea. Call it the Scambo idea.
First, we bulldoze all but the main terminal building, no more arms/legs/extensions and jetways. Now let the airlines fight for the few gates that are left.
Then bulldoze everything on the south side of Grand Central Parkway to Astoria Blvd. We can use that to build a grand terminal and parking area. Sadly for RJs, but just maybe one day mainline jets!!!!!!
Then build a walkway from our terminal in LGA to our terminal in JFK.
Still think we should consider moving, or setting up our own server. I'll give you some seed money, or an 80386 with a math co-processor running a hacked Linux build to get you started.
LGA $3.6B terminal expansion... for the other airlines.
Evidently, according to this picture, we'll run into the buildings when using the taxiways.
First, we bulldoze all but the main terminal building, no more arms/legs/extensions and jetways. Now let the airlines fight for the few gates that are left.
Evidently, according to this picture, we'll run into the buildings when using the taxiways.
First, we bulldoze all but the main terminal building, no more arms/legs/extensions and jetways. Now let the airlines fight for the few gates that are left.
Or, we extend 31 and 4 onto Riker's Island (each 11,000' without knocking down any houses), build a brand new terminal there (Call it the Commander Riker New York Intergalactic Airport), and move all the brick and barbed wire from the island to Astoria Blvd. and build a wicked tall wall. That's where we put the convicts, and we can put Snake Plissken in charge.
Banned
Joined APC: Jul 2010
Posts: 793
No wonder the profession is where its at. We have been conditioned to be afraid of being guys. Started with no pics in the cockpits( oops, will I get a violation for not using flightdeck?) Don't want to see pics in the cockpit, don't remove inspection panels/plates looking for them. As far as under/top/side boob, give me a break. The Macy's circular in the Sunday paper shows more.
Gets Weekends Off
Joined APC: May 2011
Posts: 402
Primary vacation bids are out....at least for 73nycb. Got my 68th pick...wooohooo!
Gets Weekends Off
Joined APC: Jan 2008
Position: 320A
Posts: 333
Enough of airports!
Sandra Lee........
Sandra Lee........
Thread
Thread Starter
Forum
Replies
Last Post