EDV Hiring
#132
Ref +8
Joined: Aug 2007
Posts: 384
Likes: 0
From: North by Midwest
#133
Line Holder
Joined: Apr 2008
Posts: 1,395
Likes: 1
From: the right side
#135
Ref +8
Joined: Aug 2007
Posts: 384
Likes: 0
From: North by Midwest
That was the case, I'm not sure why or what happened to change it in first place let alone why it returned to high volume. Right now there is minimal delays unless your 200. But that is being caused by an OE problem. Last I heard there is around 50 people waiting for OE at 5-7 weeks after LOE.
#136
Inverted
Joined: Jun 2009
Posts: 536
Likes: 0
From: CL65 CA
#139
Ref +8
Joined: Aug 2007
Posts: 384
Likes: 0
From: North by Midwest
Sounds about right - 200 delays are the result of the perfect storm of a
smaller fleet with less OE captains, less routes and they are shorter so OE takes longer. There is people who were hired in January still waiting to touch a plane.
smaller fleet with less OE captains, less routes and they are shorter so OE takes longer. There is people who were hired in January still waiting to touch a plane.
#140
Line Holder
Joined: Apr 2008
Posts: 1,395
Likes: 1
From: the right side
Less OE captains was caused more by the fact that a large percentage of 200 LCA's were in MSP. When the MSP 200 base closed, they went to MSP9 rather than another base.