Airline Pilot Central Forums

Airline Pilot Central Forums (https://www.airlinepilotforums.com/)
-   SkyWest (https://www.airlinepilotforums.com/skywest/)
-   -   Skywest v2.0 (https://www.airlinepilotforums.com/skywest/93589-skywest-v2-0-a.html)

ImPilot I Fly 12-25-2016 09:53 AM

Merry Christmas, Happy Hanukkah , Happy Holdiays, Happy festivus for the rest of us!

cybirr 12-25-2016 01:24 PM


Originally Posted by Jedimaster (Post 2269226)
K', so trying to get a feel for what is actually occurring in the real world ...

Here's the real world. These 'kids' are smarter, better and more knowledgeable about the way to do business than you'll ever be.

I was at SkyWest for all of 9 months before I moved onto the mainline of choice. That makes sense because I am a retired USAF officer and pilot. Needed a shot of recency-of-experience to get my app scored but that was it. Staffer the last year-and-a-half so no flying.

But saying that, my resume and credentials are what you'd expect of a 24-year mil pilot.

During my all too brief stop at SKW I was paired constantly with CA's a decade or more younger than me. In every case I was impressed by their depth of knowledge and scope of understanding about the civil aviation world. I couldn't imagine making the transition from mil flying to left seat without a substantial time in FO land learning the ropes.

You mentioned you've been out of the seat since 1995. Your lack of humility before the passage of years is stunning. Such an intractable animosity to taking the time to learn puts you way beyond the acceptable. Who would want to sit in a small cockpit with that ego?

SkyWest is not the place for that kind of arrogance.

WaterRooster 12-25-2016 03:01 PM


Originally Posted by GreenLight (Post 2269373)
1. Are there travel days on either side of mil leave? And how does it work? i.e. one calendar day on either side of the leave or 24 hours on either side?

2. In the PPM, it says mil leave gets 2.9 hours per day as a "pre-assigned activity." What does that mean?

I'll be commuting to the SKW job, so I'm just trying to figure out how to make it work.
Merry Christmas and thanks.

1. It's all based on USERRA so the return depends on the length of your leave. Drill weekend is a day (24 hours) after you are done, you pick the day it starts.
2. Pre-assigned is just got scheduling. It just locks out a block of time in the PBS which counts tword your credit total but not pay. If that makes any sense haha

Hatrick32 12-25-2016 05:01 PM

Anyone know the rules regarding maximum allowed sit time between flights? I seem to remember something about 4+ hours requires a hotel. I can't seem to find the information in the PIG.

ImPilot I Fly 12-25-2016 05:35 PM


Originally Posted by Hatrick32 (Post 2269513)
Anyone know the rules regarding maximum allowed sit time between flights? I seem to remember something about 4+ hours requires a hotel. I can't seem to find the information in the PIG.

6 I believe.

moflyer 12-25-2016 06:02 PM


Originally Posted by Hatrick32 (Post 2269513)
Anyone know the rules regarding maximum allowed sit time between flights? I seem to remember something about 4+ hours requires a hotel. I can't seem to find the information in the PIG.

It has to be six scheduled hours. If it is caused by a delay there is no guarantee of a room.

tcco94 12-25-2016 09:54 PM


Originally Posted by CapnNance (Post 2269127)
Anyone know how long the CTP course is? Starting mine the 24th of Jan and want an idea how long I'll sit before class on the 13th of Feb.

Mine was Dec 7 and it was 10 days. First 4 days were ground, 3 days off, 3 days of sims and flew out that final day. Some got sims immediately after and the longest someone had to stay was 11 days

Our class was 40 people though. A week before they will send you your sim schedule and flights.

tcco94 12-25-2016 09:59 PM


Originally Posted by LAX2MSP (Post 2269218)
If CTP is during a different month than ground school, are you still guaranteed 65hrs of pay? (I.e. CTP in January but class starts February)

I'm not sure if you're guaranteed 65 hours or if it's technically like pro rated for the amount of days. My split time from CTP to Ground is 3 weeks so I'll let you know when I get my first check next month. I know you'll get paid though. Wouldn't be surprised if it was corrected.

rickair7777 12-26-2016 04:49 AM


Originally Posted by moflyer (Post 2269534)
It has to be six scheduled hours. If it is caused by a delay there is no guarantee of a room.

They'll get you a room for an unscheduled delay if...

1) It's clear the delay will exceed 6 hours.
2) You ask.

#1 is hard to prove unless you're waiting for an airplane/crew with known ETA > 6 hours.

Squallrider 12-26-2016 05:19 AM


Originally Posted by rickair7777 (Post 2269620)
They'll get you a room for an unscheduled delay if...

1) It's clear the delay will exceed 6 hours.
2) You ask.

#1 is hard to prove unless you're waiting for an airplane/crew with known ETA > 6 hours.

All depends who you get, I've gotten them for four hour delays


All times are GMT -8. The time now is 12:23 PM.


Website Copyright © 2026 MH Sub I, LLC dba Internet Brands