![]() |
|
Originally Posted by MOTOJOE
(Post 2094764)
Anybody with inside line when last AE training /conversion will be out?
I've heard May at the earliest. Every 2-4 months is a fair estimate as to their frequency. Sent from my iPad using Tapatalk |
Maybe my last post was a little vague. I meant the last AE that just came out. When will the training conversion sheet come out for it?
|
Originally Posted by MOTOJOE
(Post 2094869)
Maybe my last post was a little vague. I meant the last AE that just came out. When will the training conversion sheet come out for it?
|
Originally Posted by MOTOJOE
(Post 2094869)
Maybe my last post was a little vague. I meant the last AE that just came out. When will the training conversion sheet come out for it?
My bad...read it too fast. Anyway, the company has until the conversion date posted in the original AE posting to convert everyone. If no training is involved it could be next bid period. If there is training it could take up until the conversion deadline and that order of training is based on seniority and if someone got a training bypass to be the last person converted. iCrew pop-ups will get the dates all straightened out. Also reference the conversion document posted around the 23-26th of each month on DeltaNet. Sent from my iPad using Tapatalk |
Originally Posted by Olario
(Post 2094423)
You are getting paid for it.
Reference PWA 23.Q.13 They can correct errors up to 2 hours prior to report. If its inside 2 hours, you are paid protected if they made a mistake I did get it resolved with this reference. I was paid at regular pay.. Thanks for the info |
Originally Posted by NoDeskJob
(Post 2094906)
Told "about 2 weeks"
|
Originally Posted by Thrust Normal
(Post 2095377)
Well isn't this place a geographical oddity, two weeks from everywhere
Classic Movie! |
Yeah it kinda blows that it takes this long to figure out training conversions for last AE. Doesn't give you much time to prepare if they spring an early April training date on ya in the last minute. I thought we have nex gen computer systems and it did this for them, or are thy still long hand.
|
Originally Posted by MOTOJOE
(Post 2095459)
Yeah it kinda blows that it takes this long to figure out training conversions for last AE. Doesn't give you much time to prepare if they spring an early April training date on ya in the last minute. I thought we have nex gen computer systems and it did this for them, or are thy still long hand.
|
Originally Posted by MOTOJOE
(Post 2095459)
Yeah it kinda blows that it takes this long to figure out training conversions for last AE. Doesn't give you much time to prepare if they spring an early April training date on ya in the last minute. I thought we have nex gen computer systems and it did this for them, or are thy still long hand.
|
| All times are GMT -8. The time now is 02:09 PM. |
|
Website Copyright © 2026 MH Sub I, LLC dba Internet Brands