New Envoy Information
#5861
About 3,2,2,3 for most, a few have a 4-leg or even a 5-leg day once in a sequence.
All of the above, some LBB and HOU turns, some trips all the way to YUL and YYC, only Mexico flying I saw was MTY turns and a few layovers. Looks like we're doing SLC, IND, COS, HOU, and GRR out of both DFW and ORD. Credit for a 4-day runs the spectrum from 12 up to 22 hours.
Again, only 175 info here.
#5864
New Hire
Joined: Dec 2014
Posts: 2
Likes: 0
From: Right Seat
I am a military pilot and was curious if the sim portion was something cosmic, or if I would even need to do that?
Also, does anyone have words on being based at DFW over ORD? And/Or words on choice of air frame for best experience/upgrade times?
Also, does anyone have words on being based at DFW over ORD? And/Or words on choice of air frame for best experience/upgrade times?
#5865
Line Holder
Joined: Oct 2016
Posts: 52
Likes: 0
There's no more sim as part of the interview, just the HR and tech portion.
#5867
Gets Weekends Off
Joined: Nov 2014
Posts: 259
Likes: 0
What I been told is that for the DEC 19th it looks we have the choice between ORD and LGA. I hope I am wrong because I want Dallas.
#5868
Gets Weekends Off
Joined: Aug 2005
Posts: 3,707
Likes: 0
Then you should look at ord crj s u c k y scedules, majority uncommutable from one side or the other.
#5869
Maybe 145 should be where you should be looking if those are your choices due to being able to transfer in equipment if there is ever a vacancy. CRJ would mean you would need a displacement to get dfw base eventually.
#5870
Gets Weekends Off
Joined: Nov 2014
Posts: 259
Likes: 0
Yeah but the 145 is over a year reserve at DFW. Also I am planning on moving to base right after IOE.
Thread
Thread Starter
Forum
Replies
Last Post



