Search

Notices
Mesa Airlines Regional Airline

Mesa

Thread Tools
 
Search this Thread
 
Old 04-03-2015 | 04:50 AM
  #7691  
Line Holder
 
Joined: Jan 2007
Posts: 89
Likes: 0
Default

Originally Posted by Pullout
Please understand an upgrade is more than switching seats and getting paid a little more. ALL the responsibility is on you. You and you alone should WANT to put forth 100% toward being a professional captain. If you're not there, no big deal; just hold off your bid in till you're ready for that responsibility. That is being a professional. If I interpreted your question incorrectly, I apologize. The EJet is an awesome plane. Personally, I don't think I'll go back to the CRJ. Schedules are much better on this side compared to the CRJ side.
Absolutely. I've been a pax captain before. I get it. Just trying to understand where/when I might be able to work on something, if at all. I mean, others must talk to there families, work out, go to dinner, etc. If anything, it's probably good to get your mind off the airplane every now and then. When are things super intense? When do they slow down a little?
Old 04-03-2015 | 07:43 AM
  #7692  
Bumbaclot's Avatar
Gets Weekends Off
 
Joined: Jun 2014
Posts: 193
Likes: 0
From: Mannin' deez blenps
Default

Pertaining to EJET:
Just ask yourself am I 100% committed to this? If your answer is no, then why are you even bothering? Yes, guys have failed out of the program. Yes, guys have failed and/or struggled with various other assets of the program. In my years of experience the ones who were not there mentally or carrying their share of the group study are going to fail somewhere early. But no, things are not super intense at training.
Then again we are utilizing different facilities (YYZ,DFW and PHX) so I cannot speak for the updates. You'll have time to relax I believe, but my advice is to get all the materials in advance. Cover it all, flash cards, CFM, GOM, limitations, etc. minimize the cramming. You should have plenty of time to do those things you list.
-rspct
Old 04-03-2015 | 10:50 AM
  #7693  
Gets Weekends Off
 
Joined: Dec 2010
Posts: 977
Likes: 0
Default

Originally Posted by Jason5
Absolutely. I've been a pax captain before. I get it. Just trying to understand where/when I might be able to work on something, if at all. I mean, others must talk to there families, work out, go to dinner, etc. If anything, it's probably good to get your mind off the airplane every now and then. When are things super intense? When do they slow down a little?
You must've not been a turbine 121 Captain before if you're asking these questions.

It's like any other initial type rating on any turbine equipment. Standard 142/initial new-to-equipment syllabus: 80 hours of groundschool M-F 8-5. Written test. A few days of procedures training/system integration. Typically a break of 1-4 weeks. 8 sim sessions with lots of downtime. Checkride/LOFT/OBS flights/IOE/Fed ride.

The only differences between the FO course and the CA course are: it's left seat, there's a few extra maneuvers, they grill you more on PIC decisionmaking, and the orals are harder. This is standard 121 training stuff--if you've flown for an airline before you should know all of the above already.

And if you have any doubts that you aren't ready--you aren't. This isn't a small responsibility or easy thing to do (and shouldn't be).
Old 04-03-2015 | 11:49 AM
  #7694  
Gets Weekends Off
 
Joined: Dec 2010
Posts: 977
Likes: 0
Default

Noticed that one CA who downgraded in IAD with the sole intention of re-upgrading to IAH popped up on the IAH CA roster (and IAH PBS award).

B/c said CA does not appear on any published awards, and was technically seat-locked on the RJ for 36 months (until I believe 2016), I guess she complained, and the company backed down and waived her equipment lock?

Anyone know how she pulled this off? Seems like the establishment of a past practice of the company waiving equipment locks for anyone who wants to status displace (CA to FO) during any bump & flush, solely to circumvent the block on CRJ->IAH
Old 04-03-2015 | 12:40 PM
  #7695  
Line Holder
 
Joined: Jan 2007
Posts: 89
Likes: 0
Default

Originally Posted by flapshalfspeed
You must've not been a turbine 121 Captain before if you're asking these questions.



It's like any other initial type rating on any turbine equipment. Standard 142/initial new-to-equipment syllabus: 80 hours of groundschool M-F 8-5. Written test. A few days of procedures training/system integration. Typically a break of 1-4 weeks. 8 sim sessions with lots of downtime. Checkride/LOFT/OBS flights/IOE/Fed ride.



The only differences between the FO course and the CA course are: it's left seat, there's a few extra maneuvers, they grill you more on PIC decisionmaking, and the orals are harder. This is standard 121 training stuff--if you've flown for an airline before you should know all of the above already.



And if you have any doubts that you aren't ready--you aren't. This isn't a small responsibility or easy thing to do (and shouldn't be).

Possibly a misunderstanding here. Not doubting my ability or readiness. It's all good. Sorry guys, wasn't trying to make it sound that way. I was taking a class online and didn't want to drop it. I did so today, so no distractions during training.


Sent from my iPhone using Tapatalk
Old 04-03-2015 | 01:16 PM
  #7696  
Gets Weekends Off
 
Joined: Dec 2010
Posts: 977
Likes: 0
Default

Originally Posted by Jason5
Possibly a misunderstanding here. Not doubting my ability or readiness. It's all good. Sorry guys, wasn't trying to make it sound that way. I was taking a class online and didn't want to drop it. I did so today, so no distractions during training.


Sent from my iPhone using Tapatalk
Good decision IMHO
Old 04-04-2015 | 01:34 AM
  #7697  
deltajuliet's Avatar
Living the Dream
 
Joined: Sep 2013
Posts: 1,795
Likes: 0
Default

This is totally unsubstantiated, but I heard a rumor today about Ejets in Denver for United.
Old 04-04-2015 | 04:03 AM
  #7698  
Line Holder
 
Joined: Jul 2006
Posts: 740
Likes: 0
Default

Well, if I had to make an unsubstantiated guess about Ejets, I would say Dallas. Yes, that goes against Mesa practices of two different planes in the same base, but a couple on this forum have said Dallas would be a 1000 pilot base. We barely even have over a 1000 pilots at Mesa as it is. The only base in the near future to downsize a little is Phoenix. The only way to have that many pilots in Dallas would be for many more jets for the American side than we already have. Ejets for the American side?
Old 04-04-2015 | 05:18 AM
  #7699  
Gets Weekends Off
 
Joined: Dec 2013
Posts: 1,602
Likes: 0
Default

Originally Posted by deltajuliet
This is totally unsubstantiated, but I heard a rumor today about Ejets in Denver for United.
They have been rumored at pretty much every United base except for IAD AND SFO
Old 04-04-2015 | 10:36 AM
  #7700  
Gets Weekends Off
 
Joined: Dec 2014
Posts: 310
Likes: 0
Default

Originally Posted by NovemberBravo
They have been rumored at pretty much every United base except for IAD AND SFO
If I had a buck for every GD ejet rumor I heard for Mesa I'd be a millionaire.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
nwa757
Regional
31
07-31-2018 04:58 PM
AirbornPegasus
Regional
14
04-08-2009 07:17 PM
Spanky189
Regional
10
05-16-2008 09:38 AM
familyguy
Regional
49
04-11-2008 12:03 AM
LOW FUEL
Regional
104
08-17-2007 04:41 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Your Privacy Choices