Reserve for Dummies
#3111
Banned
Joined: Apr 2022
Posts: 317
Likes: 1
#3112
Line Holder
Joined: Oct 2021
Posts: 1,310
Likes: 375
Because that is insane (-ly awesome) if there are no guardrails on bidding them. What are the guardrails anyway?
#3113
Banned
Joined: Apr 2022
Posts: 317
Likes: 1
Excellent question. Since we are bidding via YS, I can only assume that CS will do what they always do...ignore everything.
#3114
Line Holder
Joined: Oct 2021
Posts: 1,310
Likes: 375
"PWA 23. D. g. daily short call periods available for bid.
Note: A pilot may bid for an available short call period(s) to be awarded on a reserve line in PBS."
And yet, these are not available in PBS. According to the bid package, Yellow Slips must be submitted for these bid package short calls.
Note: A pilot may bid for an available short call period(s) to be awarded on a reserve line in PBS."
And yet, these are not available in PBS. According to the bid package, Yellow Slips must be submitted for these bid package short calls.
#3115
Moderator
Joined: Jul 2006
Posts: 7,490
Likes: 482
I doubt it, but I haven't looked into it. I'm still trying to figure out why my YS for SC was ignored, then deleted yesterday. On FB, someone said the union told them to look at the flt ops weekly update on 29Jan, but that seems to pertain to biddable SC for next month, not next day SC.
"PWA 23. D. g. daily short call periods available for bid.
Note: A pilot may bid for an available short call period(s) to be awarded on a reserve line in PBS."
And yet, these are not available in PBS. According to the bid packet, Yellow Slips must be submitted for these bid packet short calls.
Note: A pilot may bid for an available short call period(s) to be awarded on a reserve line in PBS."
And yet, these are not available in PBS. According to the bid packet, Yellow Slips must be submitted for these bid packet short calls.
I saw that, but then how to do we bid for next day SC during that window?
#3116
Line Holder
Joined: Oct 2021
Posts: 1,310
Likes: 375
I think the new not-PBS-like-it-should-be-YS-instead slips should be called Brown Slips.
#3117
Banned
Joined: Apr 2022
Posts: 317
Likes: 1
• Short Calls will be available to bid pre-month beginning with the bid window opening at 1800 on the 4th and will close at 0800 on the 19th, using the existing Yellow Slip request screen in iCrew. These requests will be deleted after Short Call awards are completed after the bid window closes.
• Any bids entered for a short call period will only be used with the pre-month award process.
• Pilots will continue to be able to enter regular Yellow Slip requests for short call periods as soon as schedules are released.
#3118
Moderator
Joined: Jul 2006
Posts: 7,490
Likes: 482
Key Reminders:
• Short Calls will be available to bid pre-month beginning with the bid window opening at 1800 on the 4th and will close at 0800 on the 19th, using the existing Yellow Slip request screen in iCrew. These requests will be deleted after Short Call awards are completed after the bid window closes.
• Any bids entered for a short call period will only be used with the pre-month award process.
• Pilots will continue to be able to enter regular Yellow Slip requests for short call periods as soon as schedules are released.
• Short Calls will be available to bid pre-month beginning with the bid window opening at 1800 on the 4th and will close at 0800 on the 19th, using the existing Yellow Slip request screen in iCrew. These requests will be deleted after Short Call awards are completed after the bid window closes.
• Any bids entered for a short call period will only be used with the pre-month award process.
• Pilots will continue to be able to enter regular Yellow Slip requests for short call periods as soon as schedules are released.
Ok, so you just bid for current SC and next month SC on the same page?
#3119
Delta IT hard at work, 2+ years after being placed on the "to do" list...
Thread
Thread Starter
Forum
Replies
Last Post



