PSA info
#5481
patience
Joined: Mar 2011
Posts: 1,068
Likes: 0
Since a lot of the CLT trips with DCA flying have DCA overnights, it's likely new trips out of the DCA base will contain more one, two and three day trips rather than the four day majority we are stuck with in CLT. DCA flying has a greater ratio of aircraft round trips to aircraft outstation RONs than CLT has. CLT flying has too many aircraft outstation RONs, causing the trips to have lower credit and be almost all four days.
#5482
Gets Weekends Off
Joined: Sep 2016
Posts: 755
Likes: 0
PDT ramp operations said that PSA is also increasing its presence in CLT. He said that PDT and AWAC are going to have less gates/flights in CLT and PSA is going to be adding more. It sounded like PDT was going to concentrate on PHL more.
#5483
On Reserve
Joined: Jun 2009
Posts: 90
Likes: 1
From: C-150
Or that the Dash 8s are getting fewer and fewer?
#5484
I'm sure the DCA lines will suck for a few months just like CVG's did when it first opened then it will all normalize by the summer. I've heard DCA is actually supposed to end up being a rather large operation for PSA, so we'll see what happens... I figure about 20 round 1 lines (basically all the DCA flying) will leave CLT to open up DCA, then as we add aircraft and pilots, they will build more round 1 lines back into the CLT flying.
#5485
Line Holder
Joined: Aug 2014
Posts: 588
Likes: 24
Crew bases in hubs are usually are commutable bc the aircraft RON at the outstations but it doesn't affect whether the trips are 2, 3, or 4 days.....that is based on the pairing build parameters. DCA should have the best productivity due to largest average stage length but many DCA trips could go through CLT all 4 days and vice versa so we wil have to see what the software spits out. The main reason for the crew base is for us to have reserves in DCA bc that is where most of our crew cancellations occur.
#5486
Crew bases in hubs are usually are commutable bc the aircraft RON at the outstations but it doesn't affect whether the trips are 2, 3, or 4 days.....that is based on the pairing build parameters. DCA should have the best productivity due to largest average stage length but many DCA trips could go through CLT all 4 days and vice versa so we wil have to see what the software spits out. The main reason for the crew base is for us to have reserves in DCA bc that is where most of our crew cancellations occur.
#5487
Gets Weekends Off
Joined: Sep 2016
Posts: 755
Likes: 0
Very true. Bidding DCA is very tempting for me personally. I love the DCA flying and the overnights are much better than CLT flying. Only problem is half the daily flights between my hometown and DCA compared to the 8 /day I enjoy between CLT. I would almost always be up super early to catch the first flight of the day into DCA, and likely always catching one of the 2 last flights back home. So I would take a QOL hit there. But the flying and the overnights are better. Decisions decisions. I think DCA may go "seniorish" for FOs and Jr for CAs when it all shakes out.
#5488
Line Holder
Joined: Aug 2014
Posts: 588
Likes: 24
Very true. Bidding DCA is very tempting for me personally. I love the DCA flying and the overnights are much better than CLT flying. Only problem is half the daily flights between my hometown and DCA compared to the 8 /day I enjoy between CLT. I would almost always be up super early to catch the first flight of the day into DCA, and likely always catching one of the 2 last flights back home. So I would take a QOL hit there. But the flying and the overnights are better. Decisions decisions. I think DCA may go "seniorish" for FOs and Jr for CAs when it all shakes out.
#5489
Line Holder
Joined: Aug 2014
Posts: 588
Likes: 24
#5490
Thread
Thread Starter
Forum
Replies
Last Post
JetJock16
Regional
63
04-08-2016 05:05 PM




