Reserve for Dummies
#1931
Line Holder
Joined: Aug 2014
Posts: 229
Likes: 6
I have a block of reserve days spanning the monthly transition, and want to move x days around in each month. I essentially want to make 2 in Sept attached to 2 in Oct into 0 in Sept and 4 in Oct. Does the system run the months concurrent, or one before the other?
Essentially, can this be accomplished in one PCS run without causing a min block error or will it take two?
thanks
Essentially, can this be accomplished in one PCS run without causing a min block error or will it take two?
thanks
#1932
Line Holder
Joined: Jan 2008
Posts: 1,775
Likes: 18
I have a block of reserve days spanning the monthly transition, and want to move x days around in each month. I essentially want to make 2 in Sept attached to 2 in Oct into 0 in Sept and 4 in Oct. Does the system run the months concurrent, or one before the other?
Essentially, can this be accomplished in one PCS run without causing a min block error or will it take two?
thanks
Essentially, can this be accomplished in one PCS run without causing a min block error or will it take two?
thanks
#1934
Line Holder
Joined: Jan 2008
Posts: 1,775
Likes: 18
#1935
Edit: And by everyone, I mean everyone. Every last person on SC had the same start time. Either the show is run by monkeys or they went to some impressive lengths to deny me my 3 hrs of pay

#1936
Gets Weekends Off
Joined: Jan 2014
Posts: 2,286
Likes: 18
#1938
#1939
Thread
Thread Starter
Forum
Replies
Last Post



