Any "Latest & Greatest" about Delta?
Gets Weekends Off
Joined APC: Jul 2007
Position: Permanently scarred
Posts: 1,707
Out of base GS given out today at 3:09 for the late London. Looks highly irregular and based on the months awards I find it hard to believe no NY 7era had a in base request in. If you did have a GS in and were legal for the trip call Skeds and claim your free 16 hours pay.
I was describing what a friend of mine had to go through when he saw that he was passed over for a GS. After two days of being put on long holds by scheduling, and being told they'd call him back (they didn't), he finally got an answer that informed him he wasn't getting anything because someone senior to him had a GS in as well. Which seems like an answer they can give to anyone who's outside the top 15 in category.
No, doesn't sound like a job for a ALPA rep....maybe someone on the staff who doesn't fly and has an ALPA retirement, but more likely you just have to live with it.
No, doesn't sound like a job for a ALPA rep....maybe someone on the staff who doesn't fly and has an ALPA retirement, but more likely you just have to live with it.
You don't have to live with it at all. DALPA has two excellent people on staff who research these issues. They are busy and it can take a few days but they do a outstanding job. The company has granted them the same level of access that a crew scheduler has in the computer system. They can research every step taken and determine if you or another pilot should have been paid and insure that has happened. 1 800 USA ALPA and ask for contract admin.
Your second take on it is a better one, IMHO.
Gets Weekends Off
Joined APC: Apr 2009
Posts: 1,568
Gets Weekends Off
Joined APC: Feb 2014
Posts: 463
Gets Weekends Off
Joined APC: Aug 2011
Posts: 167
23K
Looking for some guidance. In Europe on a 4 day. The plane inbound cnx due to maintenance. Now my trip is 5 days. I backed up trips and on my day 5 I was suppose to go back to Europe on a 3 day.
Scheduling dropped my 3 day per 23K but now my monthly schedule and time card shows I've lost the pay from the dropped trip. Tried reading the contract but was bogged down with recovery scenarios.
Anyone know if I've lost that pay? Yes, I'll call scheduling when I get back but curious for now.
Thanks...
Scheduling dropped my 3 day per 23K but now my monthly schedule and time card shows I've lost the pay from the dropped trip. Tried reading the contract but was bogged down with recovery scenarios.
Anyone know if I've lost that pay? Yes, I'll call scheduling when I get back but curious for now.
Thanks...
Bidding in months with CQ
First time through CQ.
Two days of CQ and 5 days of CQ Golden Days in a bid period, no vacation in that month.
1. If I bid and get awarded a line for that period, will PBS build a line (or attempt to) and leave the CQ Golden Days open, or were those days only guaranteed not to have CQ scheduled?
2. Same question if I bid or get awarded reserve in that month. Are they like extra X-days where reserve cannot be assigned?
Two days of CQ and 5 days of CQ Golden Days in a bid period, no vacation in that month.
1. If I bid and get awarded a line for that period, will PBS build a line (or attempt to) and leave the CQ Golden Days open, or were those days only guaranteed not to have CQ scheduled?
2. Same question if I bid or get awarded reserve in that month. Are they like extra X-days where reserve cannot be assigned?
No you are not going to lose the pay. Look on your time card for the date the trip was supposed to start. On that date under "Rot Nbr" it should say 23K and then have the value of the trip under both the "Pay Time" and "Credit" columns. If not, give it a day or two to let them figure it out, then call them.
Denny
Denny
First time through CQ.
Two days of CQ and 5 days of CQ Golden Days in a bid period, no vacation in that month.
1. If I bid and get awarded a line for that period, will PBS build a line (or attempt to) and leave the CQ Golden Days open, or were those days only guaranteed not to have CQ scheduled?
2. Same question if I bid or get awarded reserve in that month. Are they like extra X-days where reserve cannot be assigned?
Two days of CQ and 5 days of CQ Golden Days in a bid period, no vacation in that month.
1. If I bid and get awarded a line for that period, will PBS build a line (or attempt to) and leave the CQ Golden Days open, or were those days only guaranteed not to have CQ scheduled?
2. Same question if I bid or get awarded reserve in that month. Are they like extra X-days where reserve cannot be assigned?
You can sit reserve over those days and be assigned a trip, just not CQ. They are NOT extra X days.
Denny
If you don't bid them off specifically as a line holder or reserve in your monthly bid, you can be awarded/assigned a trip over them. You should not get CQ over them.
You can sit reserve over those days and be assigned a trip, just not CQ. They are NOT extra X days.
Denny
You can sit reserve over those days and be assigned a trip, just not CQ. They are NOT extra X days.
Denny
Gets Weekends Off
Joined APC: Aug 2011
Posts: 167
No you are not going to lose the pay. Look on your time card for the date the trip was supposed to start. On that date under "Rot Nbr" it should say 23K and then have the value of the trip under both the "Pay Time" and "Credit" columns. If not, give it a day or two to let them figure it out, then call them.
Denny
Denny
Gets Weekends Off
Joined APC: Feb 2008
Posts: 19,273
Your first step is to call Skeds. If they do not explain it to your liking or pay you then you call DALPA.
Thread
Thread Starter
Forum
Replies
Last Post